Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
5hours of spills in 2025 between them (typical neighbourhood: about 36)
4spill events counted
United Utilities
Croxteth Hall Lane Cso 261qdinto River Alt4 spills, 5 hours in 2025
69 planned, approved or being built and 7 running (135 MW between them). Those within 5 km are on the map above.
Rooftop solar
Peter Gilding And Company, Caddick Road - Solar PanelsApproved, not yet built · 470 kW
Dec 2024 1.2 km away
Rooftop solar
Adlib House, Kitling Road - Solar PanelsApproved, not yet built · 240 kW
Sept 2023 1.3 km away
Rooftop solar
Beverston Engineering, Unit B - Solar PanelsApproved, not yet built · 200 kW
Sept 2025 1.4 km away
Rooftop solar
Penrhyn Court, Penrhyn Road - Solar PanelsApproved, not yet built · 260 kW
Feb 2026 1.4 km away
Rooftop solar
D H L Exel Supply Chain Burton Foods, Portal Way - Solar PanelsPlanning application in · 1 MW
Jun 2023 1.5 km away
Rooftop solar
Dixons Croxteth Academy, Carr Lane East - Solar PanelsApproved, not yet built · 170 kW
Oct 2025 2.1 km away
Rooftop solar
Knowsley Industrial ParkApproved, not yet built · 350 kW
Jan 2021 2.2 km away
Battery storage
Coopers Lane, Kirkby - Battery Storage FacilityApproved, not yet built · 50 MW
Apr 2024 2.3 km away
Rooftop solar
Charley Wood Road, Knowsley Industrial Park - Solar PhotovoltaicsApproved, not yet built · 900 kW
Oct 2023 2.9 km away
Rooftop solar
Henry Diaper, Knowsley Industrial Park - Solar PanelsPlanning application in · 240 kW
May 20233.0 km away
Road and street works within 1 km
No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Mersey Tidal Power ProjectGenerating Stations · This will be an in-river proposal, located within the Mersey Riverine
environment. The Project will be located towards the mouth of the River
Mersey, between the Wirral on the west and Liverpool to the east.
Intermodal Logistics Park NorthRail Freight Interchanges · Site known as Intermodal Logistics Park North – land bounded by the M6 motorway (west), Winwick Lane (south and east) and Chat Moss railway line (north).
application due May 2027 19.3 km away
Decision
Frodsham SolarGenerating Stations · Land on Frodsham Marsh, approximately 500m to the north of Frodsham, Cheshire West and Chester
David Lloyd Leisure, Arbour Lane - Solar PanelsApproved, not yet built
Aug 2023 3.1 km away
Battery storage
Cut Lane - Battery Energy Storage SystemPlanning application in · 57 MW
Apr 2025 3.3 km away
Running nearest: IBL Cold Stores - Solar Photovoltaics Panels (rooftop solar, 4.0 km); Lister Drive (battery storage, 5.1 km); Liverpool Energy Management Facility (battery storage, 5.1 km); Land at Carnegie Road (battery storage, 5.1 km); Port of Liverpool - wind (wind farm, 8.4 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
decided Sept 2014 21.1 km away
Pre-application
Hynet North West Hydrogen PipelineGas Transporter Pipe-lines · An approximate 125km pipeline centred approximately 1km south west of Lower Whitley, Cheshire
HyNet Carbon Dioxide PipelineOther Pipe-lines · From the Ince AGI in Cheshire, via Stanlow Refinery, to Talacre Beach in North Wales
decided Mar 2024 29.5 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.