What's changing near L12 0NT
Within 2 km, around Croxteth East in Liverpool. Building, planning, schools, transport, prices and crime.
0new homes completed within 2 km, last 2 years
5homes given permission on brownfield sites since 2021
+1.9%like-for-like prices in Croxteth East, 2024 → 2025 (council +6.3%)
+3%recorded crime, last 12 months vs the 12 before
On the map
Planning grantedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
New-home postcodes with fewer than 5 homes are counted above but not listed. 0 postcodes nearby had new homes completed in the last two years.
7homes extended 2021–2025, typically adding 17 m²
26since energy certificates began (2008)
3in L12 0NT itself
- Extendedcertificate 2015
- Extendedcertificate 2015
- Extendedcertificate 2013
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
5hours of spills in 2025 between them (typical neighbourhood: about 36)
4spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
72 planned, approved or being built and 7 running (135 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Peter Gilding And Company, Caddick Road - Solar PanelsApproved, not yet built · 470 kW
Dec 2024
1.5 km away - Rooftop solar
Adlib House, Kitling Road - Solar PanelsApproved, not yet built · 240 kW
Sept 2023
1.7 km away - Rooftop solar
Beverston Engineering, Unit B - Solar PanelsApproved, not yet built · 200 kW
Sept 2025
1.9 km away - Rooftop solar
Penrhyn Court, Penrhyn Road - Solar PanelsApproved, not yet built · 260 kW
Feb 2026
1.9 km away - Rooftop solar
Dixons Croxteth Academy, Carr Lane East - Solar PanelsApproved, not yet built · 170 kW
Oct 2025
2.1 km away - Rooftop solar
D H L Exel Supply Chain Burton Foods, Portal Way - Solar PanelsPlanning application in · 1 MW
Jun 2023
2.2 km away - Battery storage
Coopers Lane, Kirkby - Battery Storage FacilityApproved, not yet built · 50 MW
Apr 2024
2.8 km away - Rooftop solar
Knowsley Industrial ParkApproved, not yet built · 350 kW
Jan 2021
2.8 km away - Rooftop solar
Charley Wood Road, Knowsley Industrial Park - Solar PhotovoltaicsApproved, not yet built · 900 kW
Oct 2023
3.5 km away - Rooftop solar
Alder Hey Hospital, East Prescot Road - Solar PV ArrayApproved, not yet built · 470 kW
Mar 20263.6 km away
Road and street works within 1 km
1 permitted works running now or planned.
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-application
Mersey Tidal Power ProjectGenerating Stations · This will be an in-river proposal, located within the Mersey Riverine
environment. The Project will be located towards the mouth of the River
Mersey, between the Wirral on the west and Liverpool to the east. application due January 2028
9.8 km away - Decideddecided May 2015
11.1 km away - Decision
Frodsham SolarGenerating Stations · Land on Frodsham Marsh, approximately 500m to the north of Frodsham, Cheshire West and Chester application due 30 May 2025
18.8 km away - Pre-application
Intermodal Logistics Park NorthRail Freight Interchanges · Site known as Intermodal Logistics Park North – land bounded by the M6 motorway (west), Winwick Lane (south and east) and Chat Moss railway line (north). application due May 2027
19.1 km away - Pre-applicationapplication due April 2027
20.0 km away - Decided
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: IBL Cold Stores - Solar Photovoltaics Panels (rooftop solar, 4.6 km); Lister Drive (battery storage, 4.7 km); Liverpool Energy Management Facility (battery storage, 4.7 km); Land at Carnegie Road (battery storage, 4.7 km); Port of Liverpool - wind (wind farm, 8.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.