Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
168hours of spills in 2025 between them (typical neighbourhood: about 36)
18spill events counted
United Utilities
Fazakerley Wwtwinto River Alt18 spills, 168 hours in 2025
62 planned, approved or being built and 6 running (134 MW between them). Those within 5 km are on the map above.
Rooftop solar
D H L Exel Supply Chain Burton Foods, Portal Way - Solar PanelsPlanning application in · 1 MW
Jun 2023 1.1 km away
Battery storage
Jeffrey Humble Playing Fields, Long Lane - Micro Energy Storage SystemApproved, not yet built · 200 kW
Sept 2025 1.8 km away
Rooftop solar
Dixons Croxteth Academy, Carr Lane East - Solar PanelsApproved, not yet built · 170 kW
Oct 2025 1.9 km away
Rooftop solar
SCS Lighting & Renewables, Aintree - Solar PanelsPlanning application in · 340 kW
Jun 2022 2.9 km away
Rooftop solar
Beverston Engineering, Unit B - Solar PanelsApproved, not yet built · 200 kW
Sept 2025 3.3 km away
Rooftop solar
Penrhyn Court, Penrhyn Road - Solar PanelsApproved, not yet built · 260 kW
Feb 2026 3.3 km away
Rooftop solar
Adlib House, Kitling Road - Solar PanelsApproved, not yet built · 240 kW
Sept 2023 3.4 km away
Rooftop solar
Peter Gilding And Company, Caddick Road - Solar PanelsApproved, not yet built · 470 kW
Dec 2024 3.4 km away
Rooftop solar
Knowsley Industrial ParkApproved, not yet built · 350 kW
Jan 2021 3.4 km away
Rooftop solar
David Lloyd Leisure, Arbour Lane - Solar PanelsApproved, not yet built
Aug 20233.6 km away
Road and street works within 1 km
11 permitted works running now or planned, 6 of them major.
Major
Sheila Walk, Field Lane EstateUtility asset works · CADENT GAS LIMITED · Some carriageway incursion
Nov 2026 to Dec 2026 100 m away
Major
Sylvia Close, Field Lane EstateUtility asset works · CADENT GAS LIMITED · Some carriageway incursion
Nov 2026 to Nov 2026 150 m away
Major
Elizabeth Road, Field Lane EstateUtility asset works · CADENT GAS LIMITED · Multi-way signals
Oct 2026 to Dec 2026 250 m away
Major
Winifred Road, Field Lane EstateUtility asset works · CADENT GAS LIMITED · Some carriageway incursion
Nov 2026 to Nov 2026 300 m away
Major
Jean Walk, Field Lane EstateUtility asset works · CADENT GAS LIMITED · Some carriageway incursion
Oct 2026 to Nov 2026 350 m away
Major
East Lancashire Road, LiverpoolUtility repair and maintenance works · MANWEB · Lane closure
Oct 2026 to Nov 2026 650 m away
Standard
Copplehouse Lane, Field Lane EstateUtility asset works · CADENT GAS LIMITED · Multi-way signals
Oct 2026 to Nov 2026 200 m away
Standard
Hawksmoor Road, Field Lane EstateUtility asset works · CADENT GAS LIMITED · Multi-way signals
Oct 2026 to Nov 2026 250 m away
Standard
Alicia Walk, Field Lane EstateUtility asset works · CADENT GAS LIMITED · No carriageway incursion
Nov 2026 to Nov 2026 400 m away
Major infrastructure projects within 30 km
Pre-application
Mersey Tidal Power ProjectGenerating Stations · This will be an in-river proposal, located within the Mersey Riverine
environment. The Project will be located towards the mouth of the River
Mersey, between the Wirral on the west and Liverpool to the east.
Intermodal Logistics Park NorthRail Freight Interchanges · Site known as Intermodal Logistics Park North – land bounded by the M6 motorway (west), Winwick Lane (south and east) and Chat Moss railway line (north).
application due May 2027 21.5 km away
Decision
Frodsham SolarGenerating Stations · Land on Frodsham Marsh, approximately 500m to the north of Frodsham, Cheshire West and Chester
Heysham Box, Leckwith Road - Battery StorageApproved, not yet built · 200 kW
Nov 2022 3.6 km away
Battery storage
Heysham Box, Leckwith Road - Battery StorageApproved, not yet built · 200 kW
Mar 2025 3.6 km away
Running nearest: IBL Cold Stores - Solar Photovoltaics Panels (rooftop solar, 4.9 km); Land at Carnegie Road (battery storage, 5.1 km); Lister Drive (battery storage, 5.1 km); Liverpool Energy Management Facility (battery storage, 5.1 km); Port of Liverpool - wind (wind farm, 6.4 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Standard
Elizabeth Road, Field Lane EstateDisconnection or alteration of supply · MANWEB · Some carriageway incursion
Oct 2026 to Oct 2026 450 m away
Minor
Lower Lane, LiverpoolHighway repair and maintenance works · LIVERPOOL CITY COUNCIL · Multi-way signals
Oct 2026 to Oct 2026 1000 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
application due April 2027 22.3 km away
Pre-application
Hynet North West Hydrogen PipelineGas Transporter Pipe-lines · An approximate 125km pipeline centred approximately 1km south west of Lower Whitley, Cheshire
HyNet Carbon Dioxide PipelineOther Pipe-lines · From the Ince AGI in Cheshire, via Stanlow Refinery, to Talacre Beach in North Wales
decided Mar 2024 29.3 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.