Country England and Wales › Region South East › Council Epsom and Ewell › Neighbourhood Worcester Park West › Postcode KT4 7BD What's changing near KT4 7BD Within 2 km, around Worcester Park West in Epsom and Ewell. Building, planning, schools, transport, prices and crime.
56 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
-1.1% like-for-like prices in Worcester Park West, 2024 → 2025 (council +2.6%)
+28% recorded crime, last 12 months vs the 12 before
On the map
New homes School opened Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 6 new homes completed houses · Oct 2026
Oct 2026 1.1 km away New homes 5 new homes completed flats · Apr 2026
Apr 2026 450 m away New homes 6 new homes completed flats · Oct 2025
Oct 2025 1.3 km away New homes 18 new homes completed flats · Nov 2024
Nov 2024 1.4 km away New school Nov 2022 500 m away New school Nov 2020 1.5 km away New-home postcodes with fewer than 5 homes are counted above but not listed. 18 postcodes nearby had new homes completed in the last two years.
53 homes extended 2021–2025, typically adding 38 m²
87 since energy certificates began (2008)
4 in KT4 7BD itself
Extended certificate 2026 Extended certificate 2020 Extended certificate 2014 Extended certificate 2009 Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 30 planned, approved or being built and 2 running (32 MW between them). Those within 5 km are on the map above.
Rooftop solar St Anthonys Hospital, London Road - Solar Panels Approved, not yet built · 240 kW
Jun 2024 2.0 km away Biomass Hook Rise South Energy Centre Approved, not yet built
Feb 2022 2.4 km away Rooftop solar David Lloyd Leisure Centre, Ewell Road - Solar PV Panels Approved, not yet built · 330 kW
Nov 2023 2.6 km away Rooftop solar Kimpton Park Way - Solar Pv Panels Planning application in · 180 kW
Aug 2023 2.9 km away Rooftop solar Wyvern Estate, Beverley Way - Solar Panels Approved, not yet built · 170 kW
Oct 2022 3.0 km away Rooftop solar Hook Rise Business Centre, Hook Rise South - Solar Panels Approved, not yet built · 180 kW
Oct 2023 3.0 km away Rooftop solar Oakpoint, Oakcroft Road - Solar Panels Approved, not yet built · 600 kW
Jun 2025 3.2 km away Rooftop solar David Lloyd Club, Bushey Road - Solar Panels Approved, not yet built · 800 kW
Sept 2023 4.2 km away Rooftop solar The Rainbow Centre, East Street - Solar Panels Approved, not yet built · 180 kW
Jan 2025 4.3 km away Rooftop solar Richard Doll Building, Cotswold Road - Solar panels Approved, not yet built · 460 kW
Jan 2024 4.8 km away Road and street works within 1 km 3 permitted works running now or planned, 2 of them major.
Major Dewsbury Gardens, Worcester Park Highway repair and maintenance works · SURREY COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026 100 m away Major Newbury Gardens, Stoneleigh Utility asset works · BT · Road closure
Nov 2026 to Nov 2026 900 m away Standard Lynwood Drive, Worcester Park New service connection · SES WATER (Formerly SUTTON & EAST SURREY WATER COMPANY) · Priority working
Oct 2026 to Oct 2026 600 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Pre-application application due March 2027 11.5 km away Decided decided May 2022 15.2 km away Decided decided Sept 2014 17.7 km away Pre-application application due December 2027 17.9 km away Pre-application Heathrow West Airports · Heathrow Airport and land to the north-west and west of Heathrow Airport application due November 2027 20.1 km away Pre-application application due March 2028 21.3 km away Decided Transport schemes within 20 km Transport Northern line extension: Battersea Power Station New Underground station, opened September 2021
Sept 2021 13.7 km away Transport Northern line extension: Nine Elms New Underground station, opened September 2021
Sept 2021 14.4 km away Transport May 2022 16.5 km away Transport HS2: Old Oak Common station Under construction (HS2 and Elizabeth line interchange)
under construction 16.9 km away Running nearest: London’s Queen Elizabeth II reservoir (solar farm, 4.6 km); Beddington EfW (energy from waste, 7.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.