Country England and Wales › Region South East › Council Guildford › Neighbourhood Horsley & Effingham › Postcode KT24 5HJ What's changing near KT24 5HJ Within 2 km, around Horsley & Effingham in Guildford. Building, planning, schools, transport, prices and crime.
73 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
-2.0% like-for-like prices in Horsley & Effingham, 2024 → 2025 (council +2.6%)
-3% recorded crime, last 12 months vs the 12 before
On the map
New homes Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 15 new homes completed houses · May 2025 – Oct 2025
Oct 2025 2.0 km away New homes 26 new homes completed 13 flats, 13 houses · Nov 2024 – Oct 2025
Oct 2025 1.9 km away New homes 7 new homes completed houses · Mar 2025 – May 2025
May 2025 1.9 km away New homes 13 new homes completed houses · Nov 2024 – Jan 2025
Jan 2025 1.9 km away New-home postcodes with fewer than 5 homes are counted above but not listed. 13 postcodes nearby had new homes completed in the last two years.
6 homes extended 2021–2025, typically adding 35 m²
15 since energy certificates began (2008)
1 in KT24 5HJ itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 18 planned, approved or being built and 3 running (8 MW between them). Those within 5 km are on the map above.
Solar farm Cobham Road, Bookham - Solar Farm Approved, not yet built · 50 MW
May 2026 3.7 km away Rooftop solar David Lloyd Leisure, Brooklands Road - Solar Photovoltaics Panels Approved, not yet built
Sept 2025 6.8 km away Battery storage Barnett Wood Lane - Battery Storage Approved, not yet built · 98 MW
Sept 2025 7.2 km away Rooftop solar Avro Way, Brooklands Industrial Park - Solar Panel Approved, not yet built · 180 kW
Mar 2024 7.4 km away Rooftop solar Big Yellow Byfleet, Oyster Lane - Solar Panels Approved, not yet built · 180 kW
Oct 2025 7.5 km away Rooftop solar Vickers Drive North, Brooklands Industrial Park - Solar Panels Approved, not yet built · 230 kW
Apr 2023 7.5 km away Rooftop solar West Byfleet Consulting Rooms, Madeira Road - Solar panels Approved, not yet built · 160 kW
Mar 2024 7.9 km away Rooftop solar Fullbrook School, Selsdon Road - Solar panels Approved, not yet built · 180 kW
Jan 2024 8.3 km away Rooftop solar Garson Farm, Winterdown Road - Solar Panels Approved, not yet built · 280 kW
Aug 2022 8.3 km away Solar farm Garson Farm, Winterdown Road - Solar Panels & Battery Storage Planning application in · 780 kW
May 2023 8.3 km away Road and street works within 1 km 4 permitted works running now or planned, 1 of them major.
Major Howard Road, East Horsley Highway repair and maintenance works · SURREY COUNTY COUNCIL · Road closure
Dec 2026 to Dec 2026 100 m away Standard Old Lane, Cobham Utility repair and maintenance works · THAMES WATER · No carriageway incursion
Oct 2026 to Nov 2026 250 m away Minor Howard Road, East Horsley Utility repair and maintenance works · AFFINITY WATER - C · Give and take
Oct 2026 to Oct 2026 100 m away Minor Forest Road, Leatherhead Utility repair and maintenance works · AFFINITY WATER - C · No carriageway incursion
Nov 2026 to Nov 2026 300 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided May 2022 4.0 km away Pre-application application due March 2027 19.9 km away Pre-application application due December 2027 20.2 km away Pre-application Heathrow West Airports · Heathrow Airport and land to the north-west and west of Heathrow Airport application due November 2027 22.0 km away Decided decided Sept 2025 22.6 km away Decided decided Nov 2023 29.5 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Cobham Motorway Service Area - Solar Photovoltaics (rooftop solar, 1.8 km); Dorking Battery Energy Storage System (battery storage, 8.2 km); Albury Landfill (landfill gas, 8.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.