Country England and Wales › Region South East › Council Guildford › Neighbourhood Horsley & Effingham › Postcode KT24 5DX What's changing near KT24 5DX Within 2 km, around Horsley & Effingham in Guildford. Building, planning, schools, transport, prices and crime.
154 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
-2.0% like-for-like prices in Horsley & Effingham, 2024 → 2025 (council +2.6%)
-3% recorded crime, last 12 months vs the 12 before
On the map
New homes Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 7 new homes completed houses · May 2026 – Jul 2026
Jul 2026 1.8 km away New homes 23 new homes completed houses · Nov 2025 – Jul 2026
Jul 2026 1.7 km away New homes 9 new homes completed houses · Jan 2025 – Dec 2025
Dec 2025 1.7 km away New homes 15 new homes completed houses · May 2025 – Oct 2025
Oct 2025 1000 m away New homes 36 new homes completed 13 flats, 23 houses · Oct 2024 – Oct 2025
Oct 2025 900 m away New homes 7 new homes completed houses · Mar 2025 – May 2025
May 2025 1000 m away New homes 9 new homes completed houses · Nov 2024 – Mar 2025
Mar 2025 1.7 km away New homes 6 new homes completed flats · Mar 2025
Mar 2025 1.9 km away New homes 13 new homes completed houses · Nov 2024 – Jan 2025
Jan 2025 1000 m away New homes 5 new homes completed houses · Oct 2024 – Nov 2024
Nov 2024 900 m away New-home postcodes with fewer than 5 homes are counted above but not listed. 24 postcodes nearby had new homes completed in the last two years.
10 homes extended 2021–2025, typically adding 60 m²
16 since energy certificates began (2008)
2 in KT24 5DX itself
Extended certificate 2024 Extended certificate 2022 Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 1 storm overflows within 2 km
1 hours of spills in 2025 between them (typical neighbourhood: about 36)
1 spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 18 planned, approved or being built and 3 running (8 MW between them). Those within 5 km are on the map above.
Solar farm Cobham Road, Bookham - Solar Farm Approved, not yet built · 50 MW
May 2026 4.6 km away Landfill gas Albury Landfill Site Extension Planning application in · 330 kW
Jul 2022 7.6 km away Rooftop solar David Lloyd Leisure, Brooklands Road - Solar Photovoltaics Panels Approved, not yet built
Sept 2025 7.6 km away Rooftop solar Surrey Hills Business Park, Sheephouse Lane - Solar Panels Approved, not yet built · 200 kW
Sept 2023 7.9 km away Rooftop solar Bucher Municipal, Curtis Road - Solar Panels Approved, not yet built · 200 kW
Feb 2023 7.9 km away Battery storage Barnett Wood Lane - Battery Storage Approved, not yet built · 98 MW
Sept 2025 7.9 km away Rooftop solar Avro Way, Brooklands Industrial Park - Solar Panel Approved, not yet built · 180 kW
Mar 2024 8.1 km away Rooftop solar Big Yellow Byfleet, Oyster Lane - Solar Panels Approved, not yet built · 180 kW
Oct 2025 8.2 km away Rooftop solar Vickers Drive North, Brooklands Industrial Park - Solar Panels Approved, not yet built · 230 kW
Apr 2023 8.3 km away Rooftop solar West Byfleet Consulting Rooms, Madeira Road - Solar panels Approved, not yet built · 160 kW
Mar 2024 8.3 km away Road and street works within 1 km 2 permitted works running now or planned, 1 of them major.
Major Forest Road, East Horsley Remedial works · AFFINITY WATER - C · Road closure
Nov 2026 to Nov 2026 700 m away Minor Forest Road, Leatherhead Utility repair and maintenance works · AFFINITY WATER - C · No carriageway incursion
Nov 2026 to Nov 2026 850 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided May 2022 4.7 km away Pre-application application due March 2027 21.0 km away Pre-application application due December 2027 21.2 km away Decided decided Sept 2025 22.2 km away Pre-application Heathrow West Airports · Heathrow Airport and land to the north-west and west of Heathrow Airport application due November 2027 23.0 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Cobham Motorway Service Area - Solar Photovoltaics (rooftop solar, 2.9 km); Dorking Battery Energy Storage System (battery storage, 7.6 km); Albury Landfill (landfill gas, 7.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.