What's changing near KT22 9AZ
Within 2 km, around Fetcham in Mole Valley. Building, planning, schools, transport, prices and crime.
37new homes completed within 2 km, last 2 years
214homes given permission on brownfield sites since 2021
+0.5%like-for-like prices in Fetcham, 2024 → 2025 (council +2.8%)
-14%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
New-home postcodes with fewer than 5 homes are counted above but not listed. 16 postcodes nearby had new homes completed in the last two years.
13homes extended 2021–2025, typically adding 49 m²
24since energy certificates began (2008)
1in KT22 9AZ itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
10hours of spills in 2025 between them (typical neighbourhood: about 36)
4spill events counted
- Thames Water
Commonsideinto Bookham Brook2 spills, 5 hours in 2025
1.8 km away - Thames Water
River Lane Pumping Stationinto Mole2 spills, 5 hours in 2025
1.6 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
13 planned, approved or being built and 2 running (6 MW between them). Those within 5 km are on the map above.
- Solar farm
Cobham Road, Bookham - Solar FarmApproved, not yet built · 50 MW
May 2026
2.8 km away - Battery storage
Barnett Wood Lane - Battery StorageApproved, not yet built · 98 MW
Sept 2025
3.3 km away - Rooftop solar
Bucher Municipal, Curtis Road - Solar PanelsApproved, not yet built · 200 kW
Feb 2023
5.9 km away - Rooftop solar
University For The Creative Arts, Ashley Road - Solar PV PanelsApproved, not yet built
Sept 2023
7.8 km away - Battery storage
University for the Creative Arts , Ashley Road - GSHP, Battery & Solar PanelsApproved, not yet built
Jan 2024
7.8 km away - Rooftop solar
Surrey Hills Business Park, Sheephouse Lane - Solar PanelsApproved, not yet built · 200 kW
Sept 2023
8.1 km away - Battery storage
Rushett Lane - Battery Storage SystemApproved, not yet built · 30 MW
Apr 2025
8.2 km away - Rooftop solar
The Rainbow Centre, East Street - Solar PanelsApproved, not yet built · 180 kW
Jan 2025
8.4 km away - Hydro
Betchworth WeirApproved, not yet built · 200 kW
Jul 2019
8.6 km away - Rooftop solar
Garson Farm, Winterdown Road - Solar PanelsApproved, not yet built · 280 kW
Aug 2022
8.7 km away
Road and street works within 1 km
4 permitted works running now or planned, 1 of them major.
- Major, planned
Lower Road, FetchamUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Multi-way signals
Oct 2027 to Feb 2028
200 m away - Standard
Keswick Road, FetchamHighway repair and maintenance works · SURREY COUNTY COUNCIL · Give and take
Nov 2026 to Nov 2026
500 m away - Minor
Guildford Road, FetchamUtility asset works · BT · Two-way signals
Oct 2026 to Oct 2026
550 m away - Minor
Leatherhead Road, BookhamUtility asset works · VIRGIN MEDIA · Two-way signals
Oct 2026 to Oct 2026
900 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided May 2022
7.8 km away - Decideddecided Sept 2025
19.0 km away - Pre-applicationapplication due March 2027
19.5 km away - Pre-applicationapplication due December 2027
21.7 km away - Pre-application
Heathrow WestAirports · Heathrow Airport and land to the north-west and west of Heathrow Airport application due November 2027
23.8 km away - Decideddecided Sept 2014
29.9 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Cobham Motorway Service Area - Solar Photovoltaics (rooftop solar, 4.1 km); Dorking Battery Energy Storage System (battery storage, 6.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.