What's changing near KT19 9XG
Within 2 km, around West Ewell in Epsom and Ewell. Building, planning, schools, transport, prices and crime.
67new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+3.2%like-for-like prices in West Ewell, 2024 → 2025 (council +2.6%)
+7%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
14 new homes completed12 flats, 2 houses · Nov 2025
Nov 2025
1000 m away - New homes
6 new homes completedflats · Oct 2025
Oct 2025
1.9 km away - New homes
13 new homes completed11 flats, 2 houses · Dec 2024 – Apr 2025
Apr 2025
1.6 km away - New homes
18 new homes completedflats · Nov 2024
Nov 2024
1.6 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 15 postcodes nearby had new homes completed in the last two years.
19homes extended 2021–2025, typically adding 41 m²
34since energy certificates began (2008)
1in KT19 9XG itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
14hours of spills in 2025 between them (typical neighbourhood: about 36)
6spill events counted
- Thames Water
Manor Drive Storm Tanksinto Hogsmill4 spills, 13 hours in 2025
700 m away - Thames Water
Epsom Storm Tanksinto Green Lanes Stream2 spills, 2 hours in 2025
1.2 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
27 planned, approved or being built and 2 running (32 MW between them). Those within 5 km are on the map above.
- Rooftop solar
The Rainbow Centre, East Street - Solar PanelsApproved, not yet built · 180 kW
Jan 2025
2.1 km away - Rooftop solar
Hook Rise Business Centre, Hook Rise South - Solar PanelsApproved, not yet built · 180 kW
Oct 2023
2.4 km away - Rooftop solar
Oakpoint, Oakcroft Road - Solar PanelsApproved, not yet built · 600 kW
Jun 2025
2.4 km away - Biomass
Hook Rise South Energy CentreApproved, not yet built
Feb 2022
2.5 km away - Rooftop solar
University For The Creative Arts, Ashley Road - Solar PV PanelsApproved, not yet built
Sept 2023
2.8 km away - Battery storage
University for the Creative Arts , Ashley Road - GSHP, Battery & Solar PanelsApproved, not yet built
Jan 2024
2.8 km away - Rooftop solar
David Lloyd Leisure Centre, Ewell Road - Solar PV PanelsApproved, not yet built · 330 kW
Nov 2023
3.2 km away - Rooftop solar
St Anthonys Hospital, London Road - Solar PanelsApproved, not yet built · 240 kW
Jun 2024
4.4 km away - Rooftop solar
Kimpton Park Way - Solar Pv PanelsPlanning application in · 180 kW
Aug 2023
5.1 km away - Rooftop solar
Toyota Limited, Yew Tree Bottom Road - Solar PanelsApproved, not yet built · 250 kW
May 2026
5.1 km away
Road and street works within 1 km
4 permitted works running now or planned, 3 of them major.
- Major
Poole Road, West EwellUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Road closure
Oct 2026 to Oct 2026
350 m away - Major, planned
Pams Way, EwellUtility asset works · BT · Road closure
Nov 2026 to Nov 2026
800 m away - Major
Pams Way, EwellUtility asset works · BT · Road closure
Nov 2026 to Nov 2026
800 m away - Minor
Bahram Road, EpsomUtility repair and maintenance works · THAMES WATER · No carriageway incursion
Oct 2026 to Oct 2026
950 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-applicationapplication due March 2027
12.7 km away - Decideddecided May 2022
13.0 km away - Pre-applicationapplication due December 2027
18.2 km away - Pre-application
Heathrow WestAirports · Heathrow Airport and land to the north-west and west of Heathrow Airport application due November 2027
20.4 km away - Decideddecided Sept 2014
20.4 km away - Decideddecided Sept 2025
23.2 km away - Pre-application
Transport schemes within 20 km
- Transport
Northern line extension: Battersea Power StationNew Underground station, opened September 2021
Sept 2021
16.4 km away - Transport
Northern line extension: Nine ElmsNew Underground station, opened September 2021
Sept 2021
17.0 km away - TransportMay 2022
19.0 km away - Transport
HS2: Old Oak Common stationUnder construction (HS2 and Elizabeth line interchange)
under construction
19.2 km away
Running nearest: London’s Queen Elizabeth II reservoir (solar farm, 4.7 km); Beddington EfW (energy from waste, 9.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.