Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
14hours of spills in 2025 between them (typical neighbourhood: about 36)
6spill events counted
Thames Water
Manor Drive Storm Tanksinto Hogsmill4 spills, 13 hours in 2025
750 m away
Thames Water
Epsom Storm Tanksinto Green Lanes Stream2 spills, 2 hours in 2025
Richard Doll Building, Cotswold Road - Solar panelsApproved, not yet built · 460 kW
Jan 2024 5.0 km away
Battery storage
Rushett Lane - Battery Storage SystemApproved, not yet built · 30 MW
Apr 2025 5.0 km away
Running nearest: London’s Queen Elizabeth II reservoir (solar farm, 5.1 km); Beddington EfW (energy from waste, 8.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Other Pipe-lines · Between Belvedere, Bexley and Pimlico, Westminster
application due March 2028 23.8 km away
Decided
Silvertown TunnelHighways · The new road tunnel will pass under the River Thames between Silvertown and North Greenwich
decided May 2018 25.4 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.