Country England and Wales › Region South East › Council Epsom and Ewell › Neighbourhood Worcester Park West › Postcode KT19 0DT What's changing near KT19 0DT Within 2 km, around Worcester Park West in Epsom and Ewell. Building, planning, schools, transport, prices and crime.
63 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
-1.1% like-for-like prices in Worcester Park West, 2024 → 2025 (council +2.6%)
+28% recorded crime, last 12 months vs the 12 before
On the map
New homes School opened Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 5 new homes completed flats · Apr 2026
Apr 2026 1.4 km away New homes 14 new homes completed 12 flats, 2 houses · Nov 2025
Nov 2025 1000 m away New homes 6 new homes completed flats · Oct 2025
Oct 2025 1.4 km away New homes 18 new homes completed flats · Nov 2024
Nov 2024 200 m away New school Nov 2022 900 m away New-home postcodes with fewer than 5 homes are counted above but not listed. 17 postcodes nearby had new homes completed in the last two years.
37 homes extended 2021–2025, typically adding 45 m²
66 since energy certificates began (2008)
0 in KT19 0DT itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 1 storm overflows within 2 km
13 hours of spills in 2025 between them (typical neighbourhood: about 36)
4 spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 27 planned, approved or being built and 2 running (32 MW between them). Those within 5 km are on the map above.
Biomass Hook Rise South Energy Centre Approved, not yet built
Feb 2022 1.6 km away Rooftop solar Hook Rise Business Centre, Hook Rise South - Solar Panels Approved, not yet built · 180 kW
Oct 2023 1.9 km away Rooftop solar Oakpoint, Oakcroft Road - Solar Panels Approved, not yet built · 600 kW
Jun 2025 2.1 km away Rooftop solar David Lloyd Leisure Centre, Ewell Road - Solar PV Panels Approved, not yet built · 330 kW
Nov 2023 3.0 km away Rooftop solar St Anthonys Hospital, London Road - Solar Panels Approved, not yet built · 240 kW
Jun 2024 3.3 km away Rooftop solar The Rainbow Centre, East Street - Solar Panels Approved, not yet built · 180 kW
Jan 2025 3.5 km away Rooftop solar Wyvern Estate, Beverley Way - Solar Panels Approved, not yet built · 170 kW
Oct 2022 3.9 km away Rooftop solar Kimpton Park Way - Solar Pv Panels Planning application in · 180 kW
Aug 2023 4.1 km away Rooftop solar University For The Creative Arts, Ashley Road - Solar PV Panels Approved, not yet built
Sept 2023 4.3 km away Battery storage University for the Creative Arts , Ashley Road - GSHP, Battery & Solar Panels Approved, not yet built
Jan 2024 4.3 km away Road and street works within 1 km 5 permitted works running now or planned, 4 of them major.
Major, planned Riverview Road, Ewell Highway repair and maintenance works · SURREY COUNTY COUNCIL · Priority working
Mar 2027 to Sept 2027 350 m away Major, planned Pams Way, Ewell Utility asset works · BT · Road closure
Nov 2026 to Nov 2026 750 m away Major Pams Way, Ewell Utility asset works · BT · Road closure
Nov 2026 to Nov 2026 750 m away Major Newbury Gardens, Stoneleigh Utility asset works · BT · Road closure
Nov 2026 to Nov 2026 950 m away Standard Meadow Walk, Ewell Disconnection or alteration of supply · UK POWER NETWORKS SOUTH EASTERN · No carriageway incursion
Oct 2026 to Oct 2026 1000 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Pre-application application due March 2027 11.6 km away Decided decided May 2022 13.9 km away Pre-application application due December 2027 17.5 km away Decided decided Sept 2014 18.9 km away Pre-application Heathrow West Airports · Heathrow Airport and land to the north-west and west of Heathrow Airport application due November 2027 19.7 km away Pre-application application due March 2028 22.6 km away Decided Transport schemes within 20 km Transport Northern line extension: Battersea Power Station New Underground station, opened September 2021
Sept 2021 14.9 km away Transport Northern line extension: Nine Elms New Underground station, opened September 2021
Sept 2021 15.6 km away Transport May 2022 17.5 km away Transport HS2: Old Oak Common station Under construction (HS2 and Elizabeth line interchange)
under construction 17.7 km away Running nearest: London’s Queen Elizabeth II reservoir (solar farm, 4.0 km); Beddington EfW (energy from waste, 8.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.