Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
St Anthonys Hospital, London Road - Solar PanelsApproved, not yet built · 240 kW
Jun 2024 7.0 km away
Rooftop solar
Hook Rise Business Centre, Hook Rise South - Solar PanelsApproved, not yet built · 180 kW
Oct 2023 7.0 km away
Running nearest: Beddington EfW (energy from waste, 9.4 km); London’s Queen Elizabeth II reservoir (solar farm, 9.4 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Airports · Heathrow Airport and land to the north-west and west of Heathrow Airport
application due November 2027 24.9 km away
Decided
Silvertown TunnelHighways · The new road tunnel will pass under the River Thames between Silvertown and North Greenwich
decided May 2018 26.8 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.