Country England and Wales › Region South East › Council Elmbridge › Neighbourhood Oatlands › Postcode KT13 9QP What's changing near KT13 9QP Within 2 km, around Oatlands in Elmbridge. Building, planning, schools, transport, prices and crime.
96 new homes completed within 2 km, last 2 years
275 homes given permission on brownfield sites since 2021
-2.7% like-for-like prices in Oatlands, 2024 → 2025 (council +0.1%)
-20% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted School opened School closed Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 5 new homes completed flats · Oct 2026
Oct 2026 1.7 km away New homes 6 new homes completed 4 flats, 2 houses · Nov 2025 – Jan 2026
Jan 2026 750 m away New homes 5 new homes completed houses · Sep 2025
Sept 2025 1.4 km away New homes 6 new homes completed houses · Jul 2025
Jul 2025 1.5 km away New homes 11 new homes completed flats · Mar 2025
Mar 2025 1.4 km away New homes 7 new homes completed flats · Jan 2025
Jan 2025 550 m away Planning permission Feb 2024 1.5 km away New school Aug 2023 1.5 km away School closed School closed: Westward School Other independent school, other independent school (closure)
Jul 2022 1.5 km away Planning permission 19 homes extended 2021–2025, typically adding 44 m²
50 since energy certificates began (2008)
0 in KT13 9QP itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 35 planned, approved or being built and 11 running (26 MW between them). Those within 5 km are on the map above.
Battery storage Rydens Road - Micro Energy Storage Approved, not yet built · 200 kW
Apr 2026 3.3 km away Energy from waste Charlton Lane Eco Park (ACT) Being built · 4 MW
May 2015 3.4 km away Solar farm Garson Farm, Winterdown Road - Solar Panels & Battery Storage Planning application in · 780 kW
May 2023 3.5 km away Battery storage Garson Farm, Winterdown Road - Solar Panels & Battery Storage Planning application in
May 2023 3.5 km away Rooftop solar Garson Farm, Winterdown Road - Solar Panels Approved, not yet built · 280 kW
Aug 2022 3.5 km away Rooftop solar David Lloyd Leisure, Brooklands Road - Solar Photovoltaics Panels Approved, not yet built
Sept 2025 3.7 km away Battery storage Sunbury Battery Energy Storage System - Battery Energy Storage System Approved, not yet built · 200 MW
Jan 2026 3.8 km away Rooftop solar Vickers Drive North, Brooklands Industrial Park - Solar Panels Approved, not yet built · 230 kW
Apr 2023 4.0 km away Battery storage Weymanor Road - Battery Storage Approved, not yet built
Oct 2024 4.0 km away Battery storage Addlestone Moor, Chertsey Road - Micro Energy Storage System Approved, not yet built · 200 kW
Jan 2026 4.3 km away Road and street works within 1 km 3 permitted works running now or planned.
Minor Castle Road, Weybridge Utility repair and maintenance works · AFFINITY WATER - C · No carriageway incursion
Feb 2027 to Feb 2027 100 m away Minor Oatlands Drive, Weybridge Utility asset works · BT · Multi-way signals
Oct 2026 to Oct 2026 350 m away Minor Ashley Park Avenue, Walton-On-Thames Utility repair and maintenance works · AFFINITY WATER - C · Some carriageway incursion
Oct 2026 to Oct 2026 950 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided May 2022 6.0 km away Pre-application application due December 2027 10.9 km away Pre-application application due March 2027 11.8 km away Pre-application Heathrow West Airports · Heathrow Airport and land to the north-west and west of Heathrow Airport application due November 2027 12.8 km away Decided decided Nov 2023 21.4 km away Decided decided Sept 2016 25.5 km away Pre-application
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Charlton Lane Eco Park (Waste AD) (anaerobic digestion, 3.4 km); Hurst Road - Walton Solar PV Farm (solar farm, 3.8 km); Walton WTW PV (solar farm, 4.0 km); Norlands Lane Landfill Site (Extension) (landfill gas, 7.0 km); Norlands Lane Landfill Site (landfill gas, 8.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.