What's changing near KT11 2SG
Within 2 km, around Oxshott & Stoke D'Abernon in Elmbridge. Building, planning, schools, transport, prices and crime.
52new homes completed within 2 km, last 2 years
5homes given permission on brownfield sites since 2021
-2.8%like-for-like prices in Oxshott & Stoke D'Abernon, 2024 → 2025 (council +0.1%)
+10%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedSchool openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
5 new homes completedhouses · Feb 2025 – Dec 2025
Dec 2025
1.4 km away - New homes
15 new homes completed4 flats, 11 houses · Feb 2025 – May 2025
May 2025
1.9 km away - New homes
5 new homes completedflats · Jan 2025 – Apr 2025
Apr 2025
1.3 km away - Planning permissionMar 2025
1.6 km away - New schoolMar 2021
1.8 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 18 postcodes nearby had new homes completed in the last two years.
20homes extended 2021–2025, typically adding 95 m²
44since energy certificates began (2008)
6in KT11 2SG itself
- Extendedcertificate 2026
- Extendedcertificate 2025
- Extendedcertificate 2024
- Extendedcertificate 2024
- Extendedcertificate 2023
- Extendedcertificate 2017
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
45hours of spills in 2025 between them (typical neighbourhood: about 36)
6spill events counted
- Thames Water
Sws, Stoke Road, Cobham, Surreyinto River Mole6 spills, 45 hours in 2025
1.4 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
22 planned, approved or being built and 5 running (11 MW between them). Those within 5 km are on the map above.
- Solar farm
Cobham Road, Bookham - Solar FarmApproved, not yet built · 50 MW
May 2026
1.7 km away - Rooftop solar
Garson Farm, Winterdown Road - Solar PanelsApproved, not yet built · 280 kW
Aug 2022
4.5 km away - Solar farm
Garson Farm, Winterdown Road - Solar Panels & Battery StoragePlanning application in · 780 kW
May 2023
4.5 km away - Battery storage
Garson Farm, Winterdown Road - Solar Panels & Battery StoragePlanning application in
May 2023
4.5 km away - Battery storage
Barnett Wood Lane - Battery StorageApproved, not yet built · 98 MW
Sept 2025
4.7 km away - Rooftop solar
David Lloyd Leisure, Brooklands Road - Solar Photovoltaics PanelsApproved, not yet built
Sept 2025
6.0 km away - Battery storage
Rydens Road - Micro Energy StorageApproved, not yet built · 200 kW
Apr 2026
6.7 km away - Rooftop solar
Vickers Drive North, Brooklands Industrial Park - Solar PanelsApproved, not yet built · 230 kW
Apr 2023
7.0 km away - Rooftop solar
Avro Way, Brooklands Industrial Park - Solar PanelApproved, not yet built · 180 kW
Mar 2024
7.0 km away - Rooftop solar
Big Yellow Byfleet, Oyster Lane - Solar PanelsApproved, not yet built · 180 kW
Oct 2025
7.2 km away
Road and street works within 1 km
No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided May 2022
4.6 km away - Pre-applicationapplication due March 2027
15.8 km away - Pre-applicationapplication due December 2027
17.2 km away - Pre-application
Heathrow WestAirports · Heathrow Airport and land to the north-west and west of Heathrow Airport application due November 2027
19.3 km away - Decideddecided Sept 2025
23.5 km away - Decideddecided Nov 2023
28.0 km away - Decided
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Cobham Motorway Service Area - Solar Photovoltaics (rooftop solar, 2.5 km); Hurst Road - Walton Solar PV Farm (solar farm, 8.8 km); London’s Queen Elizabeth II reservoir (solar farm, 9.1 km); Walton WTW PV (solar farm, 9.1 km); Charlton Lane Eco Park (Waste AD) (anaerobic digestion, 9.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.