What's changing near KT10 9LU
Within 2 km, around Esher in Elmbridge. Building, planning, schools, transport, prices and crime.
124new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+2.9%like-for-like prices in Esher, 2024 → 2025 (council +0.1%)
+10%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool closedExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
6 new homes completedhouses · Jun 2026 – Sep 2026
Sept 2026
950 m away - New homes
7 new homes completedflats · Jul 2026
Jul 2026
800 m away - New homes
8 new homes completedflats · Mar 2026
Mar 2026
300 m away - New homes
11 new homes completedflats · Mar 2026
Mar 2026
1.8 km away - New homes
65 new homes completedflats · May 2025 – Oct 2025
Oct 2025
1.1 km away - New homes
8 new homes completedflats · Jul 2025
Jul 2025
1.8 km away - School closed
School closed: Shrewsbury House Pre Preparatory SchoolOther independent school, other independent school (closure)
Jul 2025
750 m away
New-home postcodes with fewer than 5 homes are counted above but not listed. 19 postcodes nearby had new homes completed in the last two years.
10homes extended 2021–2025, typically adding 155 m²
20since energy certificates began (2008)
3in KT10 9LU itself
- Extendedcertificate 2026
- Extendedcertificate 2024
- Extendedcertificate 2022
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
27 planned, approved or being built and 5 running (11 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Garson Farm, Winterdown Road - Solar PanelsApproved, not yet built · 280 kW
Aug 2022
1.3 km away - Solar farm
Garson Farm, Winterdown Road - Solar Panels & Battery StoragePlanning application in · 780 kW
May 2023
1.3 km away - Battery storage
Garson Farm, Winterdown Road - Solar Panels & Battery StoragePlanning application in
May 2023
1.3 km away - Battery storage
Rydens Road - Micro Energy StorageApproved, not yet built · 200 kW
Apr 2026
2.8 km away - Rooftop solar
Big Yellow Self Storage, Central Avenue - Solar PanelsApproved, not yet built · 200 kW
Jul 2025
4.2 km away - Rooftop solar
Oakpoint, Oakcroft Road - Solar PanelsApproved, not yet built · 600 kW
Jun 2025
5.2 km away - Rooftop solar
Hook Rise Business Centre, Hook Rise South - Solar PanelsApproved, not yet built · 180 kW
Oct 2023
5.4 km away - Solar farm
Cobham Road, Bookham - Solar FarmApproved, not yet built · 50 MW
May 2026
5.8 km away - Biomass
Hook Rise South Energy CentreApproved, not yet built
Feb 2022
6.1 km away - Battery storage
Barnett Wood Lane - Battery StorageApproved, not yet built · 98 MW
Sept 2025
6.6 km away
Road and street works within 1 km
1 permitted works running now or planned.
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided May 2022
7.2 km away - Pre-applicationapplication due March 2027
11.5 km away - Pre-applicationapplication due December 2027
13.7 km away - Pre-application
Heathrow WestAirports · Heathrow Airport and land to the north-west and west of Heathrow Airport application due November 2027
15.9 km away - Decideddecided Sept 2014
24.2 km away - Decideddecided Nov 2023
25.6 km away - Decided
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Hurst Road - Walton Solar PV Farm (solar farm, 5.1 km); London’s Queen Elizabeth II reservoir (solar farm, 5.1 km); Walton WTW PV (solar farm, 5.3 km); Cobham Motorway Service Area - Solar Photovoltaics (rooftop solar, 6.9 km); Charlton Lane Eco Park (Waste AD) (anaerobic digestion, 7.1 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.