Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
239hours of spills in 2025 between them (typical neighbourhood: about 36)
19spill events counted
Thames Water
Esher Wastewater Treatment Worksinto River Ember And Mole19 spills, 239 hours in 2025
AC Court, High Street, Thames Ditton, KT7 0SR (other)
May 2024 1.3 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 23 postcodes nearby had new homes completed in the last two years.
Rooftop solar
Hampton Business Park, Bolney Way- Solar PanelsApproved, not yet built · 210 kW
Oct 2022 6.4 km away
Energy from waste
Charlton Lane Eco Park (ACT)Being built · 4 MW
May 2015 6.6 km away
Running nearest: London’s Queen Elizabeth II reservoir (solar farm, 2.8 km); Hurst Road - Walton Solar PV Farm (solar farm, 3.8 km); Walton WTW PV (solar farm, 3.9 km); Charlton Lane Eco Park (Waste AD) (anaerobic digestion, 6.6 km); Mogden STW (other, 8.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Other Pipe-lines · Between Belvedere, Bexley and Pimlico, Westminster
application due March 2028 26.8 km away
Pre-application
SDC M40 CampusGenerating Stations · The site of the project is located in Buckinghamshire, England. It is approximately 2km to the west of Gerrards Cross, approximately 2.5km east of Beaconsfield and approximately 1.5km north of Hedgerley. The site comprises land immediately to the south of the A40 Oxford Road and immediately to the north of the M40 motorway. It has a history of landfill activities and is currently operated by Veolia for the landfilling of inert building waste (albeit the site no longer accepts any forms of waste).
application due January 2027 28.1 km away
Decided
Silvertown TunnelHighways · The new road tunnel will pass under the River Thames between Silvertown and North Greenwich
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.