What's changing near KT10 0RY
Within 2 km, around Claygate in Elmbridge. Building, planning, schools, transport, prices and crime.
118new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+3.9%like-for-like prices in Claygate, 2024 → 2025 (council +0.1%)
+14%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool closedExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
6 new homes completedhouses · Jun 2026 – Sep 2026
Sept 2026
950 m away - New homes
7 new homes completedflats · Jul 2026
Jul 2026
1.5 km away - New homes
8 new homes completedflats · Mar 2026
Mar 2026
1.3 km away - New homes
11 new homes completedflats · Mar 2026
Mar 2026
1.6 km away - New homes
65 new homes completedflats · May 2025 – Oct 2025
Oct 2025
550 m away - School closed
School closed: Shrewsbury House Pre Preparatory SchoolOther independent school, other independent school (closure)
Jul 2025
800 m away
New-home postcodes with fewer than 5 homes are counted above but not listed. 14 postcodes nearby had new homes completed in the last two years.
26homes extended 2021–2025, typically adding 39 m²
52since energy certificates began (2008)
0in KT10 0RY itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
29 planned, approved or being built and 5 running (11 MW between them). Those within 5 km are on the map above.
- Solar farm
Garson Farm, Winterdown Road - Solar Panels & Battery StoragePlanning application in · 780 kW
May 2023
2.8 km away - Battery storage
Garson Farm, Winterdown Road - Solar Panels & Battery StoragePlanning application in
May 2023
2.8 km away - Rooftop solar
Garson Farm, Winterdown Road - Solar PanelsApproved, not yet built · 280 kW
Aug 2022
2.8 km away - Battery storage
Rydens Road - Micro Energy StorageApproved, not yet built · 200 kW
Apr 2026
3.6 km away - Rooftop solar
Oakpoint, Oakcroft Road - Solar PanelsApproved, not yet built · 600 kW
Jun 2025
3.7 km away - Rooftop solar
Hook Rise Business Centre, Hook Rise South - Solar PanelsApproved, not yet built · 180 kW
Oct 2023
3.9 km away - Rooftop solar
Big Yellow Self Storage, Central Avenue - Solar PanelsApproved, not yet built · 200 kW
Jul 2025
4.5 km away - Biomass
Hook Rise South Energy CentreApproved, not yet built
Feb 2022
4.6 km away - Battery storage
Barnett Wood Lane - Battery StorageApproved, not yet built · 98 MW
Sept 2025
6.3 km away - Solar farm
Cobham Road, Bookham - Solar FarmApproved, not yet built · 50 MW
May 2026
6.4 km away
Road and street works within 1 km
3 permitted works running now or planned, 2 of them major.
- Major, planned
Station Road, EsherUtility asset works · BT · Road closure
Jan 2027 to Jan 2027
250 m away - Major, planned
Oaken Lane, EsherUtility repair and maintenance works · THAMES WATER · Road closure
Feb 2027 to Feb 2027
400 m away - Minor
Oaken Lane, EsherUtility asset works · BT · Multi-way signals
Jan 2027 to Jan 2027
450 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided May 2022
8.6 km away - Pre-applicationapplication due March 2027
11.0 km away - Pre-applicationapplication due December 2027
14.2 km away - Pre-application
Heathrow WestAirports · Heathrow Airport and land to the north-west and west of Heathrow Airport application due November 2027
16.4 km away - Decideddecided Sept 2014
22.9 km away - Decideddecided Sept 2025
25.9 km away - Decided
Transport schemes within 20 km
- Transport
Northern line extension: Battersea Power StationNew Underground station, opened September 2021
Sept 2021
19.1 km away - Transport
HS2: Old Oak Common stationUnder construction (HS2 and Elizabeth line interchange)
under construction
19.4 km away - Transport
Northern line extension: Nine ElmsNew Underground station, opened September 2021
Sept 2021
19.8 km away
Running nearest: London’s Queen Elizabeth II reservoir (solar farm, 3.8 km); Hurst Road - Walton Solar PV Farm (solar farm, 5.6 km); Walton WTW PV (solar farm, 5.8 km); Cobham Motorway Service Area - Solar Photovoltaics (rooftop solar, 7.8 km); Charlton Lane Eco Park (Waste AD) (anaerobic digestion, 8.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.