Country England and Wales › Region South East › Council Elmbridge › Neighbourhood Claygate › Postcode KT10 0QY What's changing near KT10 0QY Within 2 km, around Claygate in Elmbridge. Building, planning, schools, transport, prices and crime.
121 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+3.9% like-for-like prices in Claygate, 2024 → 2025 (council +0.1%)
+14% recorded crime, last 12 months vs the 12 before
On the map
New homes School closed Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 6 new homes completed houses · Jun 2026 – Sep 2026
Sept 2026 1.1 km away New homes 7 new homes completed flats · Jul 2026
Jul 2026 1.6 km away New homes 8 new homes completed flats · Mar 2026
Mar 2026 1.3 km away New homes 11 new homes completed flats · Mar 2026
Mar 2026 1.9 km away New homes 65 new homes completed flats · May 2025 – Oct 2025
Oct 2025 750 m away School closed School closed: Shrewsbury House Pre Preparatory School Other independent school, other independent school (closure)
Jul 2025 850 m away New-home postcodes with fewer than 5 homes are counted above but not listed. 15 postcodes nearby had new homes completed in the last two years.
31 homes extended 2021–2025, typically adding 39 m²
61 since energy certificates began (2008)
0 in KT10 0QY itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 29 planned, approved or being built and 5 running (11 MW between them). Those within 5 km are on the map above.
Rooftop solar Garson Farm, Winterdown Road - Solar Panels Approved, not yet built · 280 kW
Aug 2022 2.8 km away Solar farm Garson Farm, Winterdown Road - Solar Panels & Battery Storage Planning application in · 780 kW
May 2023 2.8 km away Battery storage Garson Farm, Winterdown Road - Solar Panels & Battery Storage Planning application in
May 2023 2.8 km away Battery storage Rydens Road - Micro Energy Storage Approved, not yet built · 200 kW
Apr 2026 3.8 km away Rooftop solar Oakpoint, Oakcroft Road - Solar Panels Approved, not yet built · 600 kW
Jun 2025 3.8 km away Rooftop solar Hook Rise Business Centre, Hook Rise South - Solar Panels Approved, not yet built · 180 kW
Oct 2023 4.0 km away Rooftop solar Big Yellow Self Storage, Central Avenue - Solar Panels Approved, not yet built · 200 kW
Jul 2025 4.7 km away Biomass Hook Rise South Energy Centre Approved, not yet built
Feb 2022 4.7 km away Battery storage Barnett Wood Lane - Battery Storage Approved, not yet built · 98 MW
Sept 2025 6.0 km away Solar farm Cobham Road, Bookham - Solar Farm Approved, not yet built · 50 MW
May 2026 6.1 km away Road and street works within 1 km 3 permitted works running now or planned, 2 of them major.
Major, planned Station Road, Esher Utility asset works · BT · Road closure
Jan 2027 to Jan 2027 350 m away Major, planned Oaken Lane, Esher Utility repair and maintenance works · THAMES WATER · Road closure
Feb 2027 to Feb 2027 700 m away Minor Oaken Lane, Esher Utility asset works · BT · Multi-way signals
Jan 2027 to Jan 2027 300 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided May 2022 8.5 km away Pre-application application due March 2027 11.3 km away Pre-application application due December 2027 14.5 km away Pre-application Heathrow West Airports · Heathrow Airport and land to the north-west and west of Heathrow Airport application due November 2027 16.7 km away Decided decided Sept 2014 23.1 km away Decided decided Sept 2025 25.7 km away Decided Transport schemes within 20 km Transport Northern line extension: Battersea Power Station New Underground station, opened September 2021
Sept 2021 19.3 km away Transport HS2: Old Oak Common station Under construction (HS2 and Elizabeth line interchange)
under construction 19.7 km away Running nearest: London’s Queen Elizabeth II reservoir (solar farm, 4.1 km); Hurst Road - Walton Solar PV Farm (solar farm, 5.9 km); Walton WTW PV (solar farm, 6.0 km); Cobham Motorway Service Area - Solar Photovoltaics (rooftop solar, 7.6 km); Charlton Lane Eco Park (Waste AD) (anaerobic digestion, 8.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.