Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Rooftop solar
University For The Creative Arts, Ashley Road - Solar PV PanelsApproved, not yet built
Sept 2023 6.2 km away
Battery storage
University for the Creative Arts , Ashley Road - GSHP, Battery & Solar PanelsApproved, not yet built
Jan 2024 6.2 km away
Running nearest: London’s Queen Elizabeth II reservoir (solar farm, 3.5 km); Hurst Road - Walton Solar PV Farm (solar farm, 6.1 km); Walton WTW PV (solar farm, 6.3 km); Cobham Motorway Service Area - Solar Photovoltaics (rooftop solar, 8.2 km); Charlton Lane Eco Park (Waste AD) (anaerobic digestion, 8.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Generating Stations · Land at 342 Edinburgh Avenue, Slough Trading Estate, Slough, Berkshire, SL1 4TU.
Silvertown TunnelHighways · The new road tunnel will pass under the River Thames between Silvertown and North Greenwich
decided May 2018 28.6 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.