Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Bramford to Twinstead Electric Lines · 29km linear route between the Bramford Substation,Suffolk and 1.5km south of Twinstead Tee, Essex
decided Sept 2024 25.4 km away
Pre-application
LionLink InterconnectorElectric Lines · From the proposed Kiln Lane Substation near Friston, Suffolk to a landfall near Walberswick to the EEZ in the North Sea.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Kesgrave West & Rushmere: +21% over five years (2020 → 2025).
Council tax list: 0 homes added in the neighbourhood since April 2024.
Population (GP registrations): -0.7% in two years.
Raeburn Road South and Gainsborough Lane - Micro Energy Storage SystemApproved, not yet built · 200 kW
Aug 2025 5.1 km away
Battery storage
Gatacre Road - Micro Energy Storage FacilityApproved, not yet built · 200 kW
Jul 2024 5.2 km away
Running nearest: Ipswich Hospital Energy Centre (biomass, 1.8 km); University Of Suffolk Campus North (battery storage, 3.7 km); Foxhall Landfill Site (landfill gas, 4.3 km); Foxburrow Farm (solar farm, 5.6 km); Stratton Hall Solar Park (solar farm, 8.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Utility asset works · CADENT GAS LIMITED · No carriageway incursion
Nov 2026 to Dec 2026 300 m away
Major
Footway Between Birchwood Drive To The Limes, Rushmere St AndrewUtility asset works · CADENT GAS LIMITED · No carriageway incursion
Nov 2026 to Dec 2026 300 m away
Major, planned
Birchwood Drive Unassociated Footway, Rushmere St AndrewUtility asset works · CADENT GAS LIMITED · No carriageway incursion
Nov 2026 to Dec 2026 300 m away
Major
Birchwood Drive Unassociated Footway, Rushmere St AndrewUtility asset works · CADENT GAS LIMITED · No carriageway incursion
Nov 2026 to Dec 2026 300 m away