Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
EcoPower Suffolk SolarGenerating Stations · On land near National Grid’s Yaxley electricity substation at Leys Lane, Yaxley, Suffolk, within the administrative area of Mid Suffolk District Council.
application due March 2027 13.1 km away
Examination
East Pye SolarGenerating Stations · The project is proposed as being built across multiple sites approximately 1,100 hectares (2,718 acres) in area, located south of Norwich and north of Harleston. The solar sites are concentrated east of Long Stratton, with an additional cluster located south of Great Moulton, approximately 6.5km to the southwest of the solar sites around Long Stratton.
application due March 2026 16.7 km away
Pre-application
LionLink InterconnectorElectric Lines · From the proposed Kiln Lane Substation near Friston, Suffolk to a landfall near Walberswick to the EEZ in the North Sea.
East Anglia TWO Offshore WindfarmGenerating Stations · An area of 218.4km2 approximately 37km from Lowestoft & 32km from Southwold at closest point
decided Mar 2022 27.0 km away
Decided
A47 - A11 Thickthorn Junction Highways · A47 and A11 Thickthorn Interchange approximately 5.5km south west of Norwich City Centre
decided Oct 2022 29.3 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.