What's changing near IP21 4QT
Within 2 km, around Harleston & Pulham in South Norfolk. Building, planning, schools, transport, prices and crime.
0new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+2.7%like-for-like prices in Harleston & Pulham, 2024 → 2025 (council +0.3%)
+21%recorded crime, last 12 months vs the 12 before
On the map
Extended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
No new homes (5+ in a postcode), planning permissions or school changes recorded within 2 km.
New-home postcodes with fewer than 5 homes are counted above but not listed. 0 postcodes nearby had new homes completed in the last two years.
4homes extended 2021–2025, typically adding 25 m²
8since energy certificates began (2008)
1in IP21 4QT itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
72hours of spills in 2025 between them (typical neighbourhood: about 36)
6spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
12 planned, approved or being built and 1 running (15 MW between them). Those within 5 km are on the map above.
- Solar farm
Semere Lane, Dickleburgh - Solar FarmPlanning application in · 50 MW
Jul 2025
3.7 km away - Rooftop solar
East Of England Co Op, Bullock Fair Close - Solar PanelsPlanning application in · 190 kW
May 2026
4.1 km away - Solar farm
Station Road, Tivetshall St Margaret - Solar PV PanelsApproved, not yet built · 20 MW
Jun 2025
4.3 km away - Solar farm
East Pye Solar FarmPlanning application in · 500 MW
Apr 2026
5.9 km away - Battery storage
East Pye Solar FarmPlanning application in
Apr 2026
5.9 km away - Rooftop solar
Peddars Milling, Mill Road - Solar PanelsApproved, not yet built · 400 kW
Mar 2025
6.9 km away - Battery storage
Market Lane And Carr Lane, Great Moulton - Battery Energy Storage SystemPlanning application in · 400 MW
Jun 2025
7.2 km away - Solar farm
Farmers Industrial Estate,Mill Road - Solar PV SystemsApproved, not yet built · 1 MW
Apr 2024
7.3 km away - Battery storage
Long Stratton Leisure Centre, Long Stratton - BatteryApproved, not yet built · 300 kW
Feb 2025
8.0 km away - Rooftop solar
Long Stratton Leisure Centre, Long Stratton - Solar PanelsApproved, not yet built · 140 kW
Feb 2025
8.0 km away
Road and street works within 1 km
1 permitted works running now or planned, 1 of them major.
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Examination
East Pye SolarGenerating Stations · The project is proposed as being built across multiple sites approximately 1,100 hectares (2,718 acres) in area, located south of Norwich and north of Harleston. The solar sites are concentrated east of Long Stratton, with an additional cluster located south of Great Moulton, approximately 6.5km to the southwest of the solar sites around Long Stratton. application due March 2026
8.9 km away - Pre-application
EcoPower Suffolk SolarGenerating Stations · On land near National Grid’s Yaxley electricity substation at Leys Lane, Yaxley, Suffolk, within the administrative area of Mid Suffolk District Council. application due March 2027
10.9 km away - Decideddecided Jul 2015
12.6 km away - Decideddecided Apr 2024
16.2 km away - Recommendation
Norwich to TilburyElectric Lines · Reinforcement of the electricity transmission network between Norwich and Tilbury Substations application due August 2025
17.2 km away - Decided
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.