Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
564hours of spills in 2025 between them (typical neighbourhood: about 36)
47spill events counted
Anglian Water
Dickleburgh Water Recycling Centreinto River Frenze River Waveney Nt47 spills, 564 hours in 2025
19 planned, approved or being built and 3 running (20 MW between them). Those within 5 km are on the map above.
Solar farm
Semere Lane, Dickleburgh - Solar FarmPlanning application in · 50 MW
Jul 2025 1.1 km away
Solar farm
Farmers Industrial Estate,Mill Road - Solar PV SystemsApproved, not yet built · 1 MW
Apr 2024 3.4 km away
Solar farm
Station Road, Tivetshall St Margaret - Solar PV PanelsApproved, not yet built · 20 MW
Jun 2025 4.0 km away
Solar farm
Marsh Lane Solar Farm, Lion Road - Solar FarmApproved, not yet built · 30 MW
Aug 2025 4.8 km away
Rooftop solar
Bartrums Road Service, Brome Industrial Park - Solar PanelsApproved, not yet built · 150 kW
Jun 2026 7.5 km away
Rooftop solar
East Of England Co Op, Bullock Fair Close - Solar PanelsPlanning application in · 190 kW
May 2026 7.7 km away
Solar farm
The Grange Solar Farm & Battery StorageApproved, not yet built · 48 MW
Nov 2023 8.0 km away
Battery storage
The Grange Solar Farm & Battery StorageApproved, not yet built
Nov 2023 8.0 km away
Battery storage
Yaxley, Eye Airfield Industrial Estate - Battery Storage SystemApproved, not yet built · 200 MW
Jul 2025 8.0 km away
Battery storage
Progress Way, Eye Airfield Industrial Estate - Micro Energy StorageApproved, not yet built · 200 kW
Apr 20258.0 km away
Road and street works within 1 km
No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
EcoPower Suffolk SolarGenerating Stations · On land near National Grid’s Yaxley electricity substation at Leys Lane, Yaxley, Suffolk, within the administrative area of Mid Suffolk District Council.
East Pye SolarGenerating Stations · The project is proposed as being built across multiple sites approximately 1,100 hectares (2,718 acres) in area, located south of Norwich and north of Harleston. The solar sites are concentrated east of Long Stratton, with an additional cluster located south of Great Moulton, approximately 6.5km to the southwest of the solar sites around Long Stratton.
Progress Way, Mid Suffolk Business Park - Energy Storage SystemApproved, not yet built · 200 kW
Jan 2026 8.0 km away
Solar farm
Burnt House Farm, Hoxne Road - Solar PV ArrayApproved, not yet built · 300 kW
Jan 2025 8.1 km away
Running nearest: Victoria Road - Solar Photovoltaic System (rooftop solar, 6.0 km); Humphrey Group (wind farm, 8.0 km); Eye Biomass Plant (biomass, 8.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Highways · A47 and A11 Thickthorn Interchange approximately 5.5km south west of Norwich City Centre
decided Oct 2022 22.8 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.