What's changing near IP19 8BX
Within 2 km, around Halesworth & Wangford in East Suffolk. Building, planning, schools, transport, prices and crime.
108new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
-1.3%like-for-like prices in Halesworth & Wangford, 2024 → 2025 (council +0.8%)
+25%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
16 new homes completedhouses · Dec 2025 – Oct 2026
Oct 2026
1000 m away - New homes
26 new homes completedhouses · Jul 2025 – Mar 2026
Mar 2026
900 m away - New homes
15 new homes completedhouses · Dec 2025
Dec 2025
1.4 km away - New homes
18 new homes completed2 flats, 16 houses · Nov 2024 – Aug 2025
Aug 2025
850 m away - New homes
17 new homes completedhouses · Dec 2024 – Jul 2025
Jul 2025
900 m away - New homes
5 new homes completedhouses · May 2025
Jun 2025
950 m away
New-home postcodes with fewer than 5 homes are counted above but not listed. 11 postcodes nearby had new homes completed in the last two years.
3homes extended 2021–2025, typically adding 23 m²
13since energy certificates began (2008)
0in IP19 8BX itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
39hours of spills in 2025 between them (typical neighbourhood: about 36)
7spill events counted
- Anglian Water
Halesworth Wrcinto The River Blyth Nt7 spills, 39 hours in 2025
1.3 km away - Anglian Water
Halesworth Wrcinto The River Blyth Nt0 spills, 0 hours in 2025
1.3 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
11 planned, approved or being built and 4 running (39 MW between them). Those within 5 km are on the map above.
- Battery storage
Halesworth Middle School, Harrisons Lane - Micro Energy Storage SystemPlanning application in · 200 kW
Jun 2024
550 m away - Battery storage
Norwich Road Industrial EstateBeing built · 50 MW
Apr 2022
1.2 km away - Solar farm
Wissett Solar Farm, Wissett - Solar Photovoltaic (PV) Farm (Apple Tree)Approved, not yet built · 27 MW
Feb 2025
1.5 km away - Battery storage
Wissett Solar Farm, Wissett - Battery Storage (Apple Tree)Approved, not yet built · 10 MW
Feb 2025
1.5 km away - Rooftop solar
Spectra Packaging Solutions Limited, Antonine Way - Solar PanelsApproved, not yet built · 700 kW
Sept 2023
1.5 km away - Solar farm
Chediston Hall - 40MW Solar PanelsPlanning application in · 40 MW
Jun 2025
1.6 km away - Solar farm
Earlsway Farm, Bramfield - Solar Pv SystemApproved, not yet built · 230 kW
Feb 2024
5.6 km away - Rooftop solar
Home Farm, Halesworth Road - Solar PanelsApproved, not yet built · 280 kW
Apr 2026
6.4 km away - Solar farm
Haw Wood, Thorington - Solar PV PanelsApproved, not yet built · 1 MW
Dec 2024
6.9 km away - Solar farm
Redisham Hall Farm, School Road - Solar PanelsPlanning application in · 42 MW
Jun 2025
8.9 km away
Road and street works within 1 km
12 permitted works running now or planned, 9 of them major.
- Major, planned
Chichester Road, HalesworthUtility asset works · CADENT GAS LIMITED · Road closure
Oct 2026 to Oct 2026
450 m away - Major
Chichester Road, HalesworthUtility asset works · CADENT GAS LIMITED · Road closure
Oct 2026 to Oct 2026
450 m away - Major, planned
Chediston Street, HalesworthNew service connection · ESSEX AND SUFFOLK WATER · Road closure
Nov 2026 to Nov 2026
500 m away - Major, planned
Mount Pleasant, HalesworthUtility asset works · CADENT GAS LIMITED · Road closure
Oct 2026 to Oct 2026
500 m away - Major
Mount Pleasant, HalesworthUtility asset works · CADENT GAS LIMITED · Road closure
Oct 2026 to Oct 2026
500 m away - Major
Old Station Road, HalesworthUtility asset works · CADENT GAS LIMITED · Temp obstruction 15 minute delay
Oct 2026 to Oct 2026
650 m away - Major
Harrisons Lane, HalesworthUtility asset works · CADENT GAS LIMITED · Multi-way signals
Oct 2026 to Oct 2026
650 m away - Major, planned
Fairview Road, HalesworthUtility asset works · CADENT GAS LIMITED · Road closure
Oct 2026 to Oct 2026
950 m away - Major
Fairview Road, HalesworthUtility asset works · CADENT GAS LIMITED · Road closure
Oct 2026 to Oct 2026
950 m away - Standard
Major infrastructure projects within 30 km
- Pre-application
LionLink InterconnectorElectric Lines · From the proposed Kiln Lane Substation near Friston, Suffolk to a landfall near Walberswick to the EEZ in the North Sea. application due April 2027
16.6 km away - Decideddecided Jul 2022
17.2 km away - Decideddecided Mar 2022
19.2 km away - Decideddecided Mar 2022
19.2 km away - Decideddecided Apr 2020
21.1 km away - Examination
East Pye SolarGenerating Stations · The project is proposed as being built across multiple sites approximately 1,100 hectares (2,718 acres) in area, located south of Norwich and north of Harleston. The solar sites are concentrated east of Long Stratton, with an additional cluster located south of Great Moulton, approximately 6.5km to the southwest of the solar sites around Long Stratton.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Chediston Hall Solar Park (solar farm, 2.1 km); Holton Airfield (solar farm, 2.2 km); Upper Holton Wind Farm (wind farm, 3.0 km); Reydon Farm (solar farm, 9.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.