Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Road and street works within 1 km
No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
LionLink InterconnectorElectric Lines · From the proposed Kiln Lane Substation near Friston, Suffolk to a landfall near Walberswick to the EEZ in the North Sea.
EcoPower Suffolk SolarGenerating Stations · On land near National Grid’s Yaxley electricity substation at Leys Lane, Yaxley, Suffolk, within the administrative area of Mid Suffolk District Council.
application due March 2027 28.6 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Saxmundham & Coldfair Green: +16% over five years (2020 → 2025).
Council tax list: 40 homes added in the neighbourhood since April 2024.
Population (GP registrations): -1.3% in two years.