Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
4storm overflows within 2 km
297hours of spills in 2025 between them (typical neighbourhood: about 36)
62spill events counted
Anglian Water
Framlingham Stwinto River Ore25 spills, 195 hours in 2025
1.2 km away
Anglian Water
Woodbridge Rd Csointo River Ore25 spills, 74 hours in 2025
900 m away
Anglian Water
Fairfield Roadinto River Ore11 spills, 17 hours in 2025
550 m away
Anglian Water
Fore Street Csointo River Ore1 spills, 11 hours in 2025
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Road and street works within 1 km
2 permitted works running now or planned.
Minor
College Road, FramlinghamUtility asset works · BT · Multi-way signals
Oct 2026 to Oct 2026 650 m away
Minor
Dennington Road, FramlinghamUtility asset works · BT · Multi-way signals
Oct 2026 to Oct 2026 750 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
LionLink InterconnectorElectric Lines · From the proposed Kiln Lane Substation near Friston, Suffolk to a landfall near Walberswick to the EEZ in the North Sea.
East Anglia TWO Offshore WindfarmGenerating Stations · An area of 218.4km2 approximately 37km from Lowestoft & 32km from Southwold at closest point
decided Mar 2022 19.6 km away
Pre-application
EcoPower Suffolk SolarGenerating Stations · On land near National Grid’s Yaxley electricity substation at Leys Lane, Yaxley, Suffolk, within the administrative area of Mid Suffolk District Council.
application due March 2027 20.7 km away
Decided
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Framlingham & Hacheston: +19% over five years (2020 → 2025).
Council tax list: 30 homes added in the neighbourhood since April 2024.
Population (GP registrations): -2.4% in two years.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.