Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
LionLink InterconnectorElectric Lines · From the proposed Kiln Lane Substation near Friston, Suffolk to a landfall near Walberswick to the EEZ in the North Sea.
Bluestem Road - Solar PanelsApproved, not yet built · 290 kW
Jan 2023 9.1 km away
Battery storage
Amenity Land Opp To Crown Court, Chancery Road - Micro Battery StoragePlanning application in · 200 kW
Apr 2026 9.3 km away
Running nearest: Ipswich Hospital Energy Centre (biomass, 6.6 km); Foxhall Landfill Site (landfill gas, 6.7 km); Foxburrow Farm (solar farm, 7.3 km); University Of Suffolk Campus North (battery storage, 8.2 km); Lower Ufford Lane (solar farm, 8.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Generating Stations · On land near National Grid’s Yaxley electricity substation at Leys Lane, Yaxley, Suffolk, within the administrative area of Mid Suffolk District Council.
application due March 2027 28.5 km away
Decided
Bramford to Twinstead Electric Lines · 29km linear route between the Bramford Substation,Suffolk and 1.5km south of Twinstead Tee, Essex
decided Sept 2024 29.0 km away