11, Airthrie Road, IG3 9QTConstruction of a single-storey rear extension extending 6.0 metres beyond the original rear wall of the dwellinghouse, with an eaves height not exceeding 3.0 metres and a maximum overall height not exceeding 4.0 metres.Redbridge 2602/26 · Prior Approval
Oct 2026 150 m away
Application Under Consideration
5 5A, AIRTHRIE ROADConversion of two self-contained flats into a Single Dwellinghouse. (summary)Redbridge 2570/26 · All Other
Oct 2026 100 m away
Application Under Consideration
17, Airthrie Road, IG3 9QTDischarge of conditions for approved permission 2651/22: Car Parking (condition 3); Soft landscaping - existing and proposed (condition 4); Cycle Parking (condition 5); Refuse storage and recycling facilities (prior to occupation) (condition 6); Management Plan (condition 7); Communal amenity space (condition 8); Fire Safety (condition 9) (summary) 3, 4, 5, 6, 7, 8, 9Redbridge 2651/22/02 · All Other
Sept 2026 150 m away
Application Under Consideration
4, Lhs, ROWALLEN PARADE, GREEN LANE, RM8 1XUConstruction of a single storey rear extension to facilitate additional storage and 1no studio flat with associated cycle and refuse storage and associated works.Barking & Dagenham 26/01308/FULL · All Other
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
3storm overflows within 2 km
195hours of spills in 2025 between them (typical neighbourhood: about 36)
74spill events counted
Thames Water
South Park,into Loxford Water42 spills, 126 hours in 2025
1.7 km away
Thames Water
Longbridge Roadinto Mayes Brook28 spills, 65 hours in 2025
1.3 km away
Thames Water
Longbridge Roadinto Mayes Brook4 spills, 5 hours in 2025
New-home postcodes with fewer than 5 homes are counted above but not listed. 39 postcodes nearby had new homes completed in the last two years.
Sept 2026 350 m away
Application Under Consideration
628, DEVELOPMENT AT 628, GREEN LANESubdivision of single dwellinghouse to create three-bedroom flat at ground floor level and change of use of first and second floors to a Small HMO for up to 6 people. (summary)Redbridge 2428/26 · All Other · 2 homes proposed
64, EMPIRE HOUSE, Castleton Road, IG3 9QS64 Castleton Road variation condition 3Redbridge 2409/26 · All Other
Sept 2026 100 m away
Application Under Consideration
DEVELOPMENT AT 66 TO 86 GOODMAYES ROAD AND 1 TO 27, NORWICH MEWSDemolish existing structure. Erection of part single, part two-storey building to create 6 additional aparthotel rooms, forming an annexe to existing Goodmayes Hotel. (summary)Redbridge 2255/26 · All Other
Aug 2026 400 m away
Application Under Consideration
82, Kinfauns Road, IG3 9QNChange of use from a single dwelling house into a small HMO for up to 6 people. (Summary).Redbridge 2148/26 · All Other
Aug 2026 100 m away
Approved
35, Abbotsford Road, IG3 9QXLoft conversion with a rear dormer. Hip to gable roof alteration. One front roof light. (Summary).Redbridge 1939/26 · All Other
Aug 2026 350 m away
Approved
22, Abbotsford Road, IG3 9SLDemolish rear conservatory. Single storey rear extension. (Summary).Redbridge 1752/26 · All Other
Jul 2026 450 m away
Application Under Consideration
70, DUNKELD ROAD, RM8 2PTPrior notification application for the construction of a single storey rear extension. The proposed extension will extend beyond the rear wall by 6.00 metres. The maximum height of the proposed extension from the natural ground level is 3.50 metres. The height at eaves level of the proposed extension measured from the natural ground level is 3.00 metres.Barking & Dagenham 26/01011/PRIEXT · Householder
Jul 2026 450 m away
Not Required
35, Abbotsford Road, IG3 9QXSingle storey rear extension with a depth of 6.00 metres, highest point of 3.00 metres and height at the eaves of 2.70 metres.Redbridge 1692/26 · All Other
Jun 2026 350 m away
Approved
DEVELOPMENT AT AND REAR OF 596, GREEN LANEUpwards extension to create second floor. Three storey front extension, to create balconies. Installation of external staircase to rear. Creation of one studio flat with associated cycle and refuse storage. Alterations to rear fenestrations at 596 Green Lane. (summary)Redbridge 1510/26 · All Other · 1 homes proposed
Jun 2026 350 m away
Approved
56, Aberdour Road, IG3 9PGDetached rear outbuilding. (Summary)Redbridge 1653/26 · All Other
Jun 2026 450 m away
Refused
61, Castleton Road, IG3 9QWUse as a large HMO (Sui Generis) for up to 11 occupants. (Summary).Redbridge 1401/26 · All Other
Jun 2026 50 m away
Approved
5, ALLOA ROAD, IG3 9SWFirst floor rear extension. Alterations to fenestrations. (summary)Redbridge 1441/26 · All Other
Jun 2026 250 m away
Approved
17 17A, ABERDOUR ROADConversion of two self-contained flats into one (one x 6-bedroom) single dwelling house with associated amenity space, waste/refuse and cycle storage. (Summary)Redbridge 1325/26 · All Other · 1 homes proposed
Jun 2026 200 m away
Refused
17, Airthrie Road, IG3 9QTDischarge of conditions of approved permission 2651/22: Car Parking (Condition 3), Soft Landscaping (Condition 4), Cycle Parking (Condition 5), Refuse Storage (Condition 6), Management Plan (Condition 7), Communal Amenity Space (Condition 8), Fire Safety (Condition 9). (summary)Redbridge 2651/22/01 · All Other
May 2026 150 m away
Application Under Consideration
34 36, 34-36, Goodmayes Lane, IG3 9NZInternal alterations to reduce room numbers, increase room sizes and create additional communal area to allow increased number of occupants for Sui Generis Use Class Order.Redbridge 1171/26 · All Other
May 2026 500 m away
Application Under Consideration
64, DEVELOPMENT AT 64, Castleton Road, IG3 9QSConversion of the new-built refuse store and cycle store provided for the newly built 8 flats, into an additional ground floor studio flat.Redbridge 0879/26 · All Other · 1 homes proposed
Apr 2026 100 m away
Application Under Consideration
17, ROWALLEN PARADE, GREEN LANE, RM8 1XUChange of Use of first floor and loft offices (Use Class E(G)) to 6 dwellings (Use Class C3) comprising of 1x3bed, 1x2bed, 1xStudio, and 3x1bed including the construction of a rear dormer extensionBarking & Dagenham 26/00523/FULL · All Other · 6 homes proposed
Apr 2026 400 m away
Application Under Consideration
133, Kinfauns Road, IG3 9QJoutbuildingRedbridge 0972/26 · All Other · 1 homes proposed
Apr 2026 200 m away
Source: Planning London Datahub (Greater London Authority and the London boroughs); applications validated since January 2023. Data is published as received and may contain errors; check the borough's planning portal for documents.
Apr 2025 4.1 km away
Rooftop solar
Pooles Lane - Solar PV PanelsApproved, not yet built · 350 kW
Aug 2025 4.2 km away
Rooftop solar
Nic Ice, Thames Road - Solar PanelsApproved, not yet built
Dec 2024 4.4 km away
Running nearest: Ford Motor Company Ltd (Extension) (wind farm, 4.6 km); Dagenham Docks Biogas (Waste AD) (anaerobic digestion, 4.6 km); Beckton Sewage Treatment Works (wind farm, 4.9 km); Beckton STW Enhanced Sludge Digestion (other, 4.9 km); East Dagenham Docks AD (AD) (anaerobic digestion, 5.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Douglas Road, IlfordHighway repair and maintenance works · LONDON BOROUGH OF REDBRIDGE · No carriageway incursion
Oct 2026 to Oct 2026 1000 m away
Minor
Goodmayes Lane, IlfordUtility repair and maintenance works · CADENT GAS LIMITED · No carriageway incursion
Oct 2026 to Oct 2026 400 m away
Minor
Mayesbrook Road, IlfordNew service connection · ESSEX AND SUFFOLK WATER · Give and take
Oct 2026 to Oct 2026 750 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Tilbury2Harbour Facilities · Site of the former Tilbury Power Station, approximately 1 km east of the existing Port of Tilbury
decided Feb 2019 22.0 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.