+5%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedSchool openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
New homes
90 new homes completedflats · Aug 2026 – Oct 2026
Oct 2026 1000 m away
New homes
56 new homes completedflats · May 2026 – Jun 2026
Jun 2026 1000 m away
New homes
56 new homes completedflats · May 2026
May 2026 600 m away
New homes
23 new homes completedflats · Jan 2026
Jan 2026 1.7 km away
New homes
27 new homes completedflats · Dec 2025
Dec 2025 250 m away
New homes
16 new homes completedhouses · Sep 2025 – Nov 2025
Nov 2025 250 m away
New homes
10 new homes completedhouses · Sep 2025 – Nov 2025
Nov 2025 200 m away
New homes
21 new homes completedflats · Aug 2025
Aug 2025 1.1 km away
New homes
21 new homes completedflats · Aug 2025
Aug 2025 1.1 km away
New homes
17 new homes completedhouses · Jun 2025
Jun 2025 150 m away
New homes
29 new homes completedflats · Oct 2024 – Dec 2024
Dec 2024 1.4 km away
New homes
50 new homes completedflats · Nov 2024
Nov 2024 1.3 km away
Planning permission
Planning applications within 500 m
7applications in the last 12 months
2approved · 0 refused
5still being decided
0net new homes in approved schemes since 2023
Application Under Consideration
12, SHEARWATER CLOSE, IG11 0GWDemolition of an existing rear bay window and construction of a single storey rear extensionBarking & Dagenham 26/01319/HSE · Householder
Sept 2026 500 m away
Application Under Consideration
De Pass Wharf, Land To The South Of River Road,, RIVER ROAD, IG11 0DSClosure of the existing north western vehicular access and widening of the existing north eastern access and associated worksBarking & Dagenham 26/01125/FULL · All Other
Sept 2026 450 m away
Application Under Consideration
6, Lambert Road, IG11 0QWInstallation of a front gate and 2x piersBarking & Dagenham 26/01152/HSE · Householder
Aug 2026 200 m away
Application Under Consideration
12, SHEARWATER CLOSE, IG11 0GWPrior notification application for the construction of a single storey rear extension. The proposed extension will extend beyond the rear wall by 4.50 metres. The maximum height of the proposed extension from the natural ground level is 2.95 metres. The height at eaves level of the proposed extension measured from the natural ground level is 2.80 metresBarking & Dagenham 26/01135/PRIEXT · Householder
Aug 2026 500 m away
Approved
63, GALLEONS DRIVE, IG11 0FAConstruction of single storey rear extensionBarking & Dagenham 25/01782/HSE · Householder
Dec 2025 400 m away
Application Under Consideration
63, GALLEONS DRIVE, IG11 0FAApplication for a lawful development certificate (proposed) for the construction of a single storey rear extensionBarking & Dagenham 25/01626/CLUP · Householder
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
3storm overflows within 2 km
20hours of spills in 2025 between them (typical neighbourhood: about 36)
4spill events counted
Thames Water
Tideway Combined Sewer Overflowinto River Thames (Tidal)2 spills, 20 hours in 2025
1000 m away
Thames Water
Beckton Stwinto Thames Tidal2 spills, 1 hours in 2025
1.1 km away
Thames Water
Gascoigne Roadinto River Roding(Barking Creek)0 spills, 0 hours in 2025
New-home postcodes with fewer than 5 homes are counted above but not listed. 19 postcodes nearby had new homes completed in the last two years.
Nov 2025 400 m away
Approved
21, RIVERDALE CLOSE, IG11 0GQConstruction of a two storey side extensionBarking & Dagenham 25/01564/HSE · Householder
Nov 2025 450 m away
Application Under Consideration
17, Shearwater Close, IG11 0GWSingle storey rear extension constructed in facing brickwork incorporating glazed doors towards the garden and having a pitcher tiled roof with pitched roof windows. All materials to match the existing property. Purpose of the extension is to create a larger Kitchen and Dining facility and 2 study areas for the growing family.Barking & Dagenham 25/01163/PRIEXT · Prior Approval
Aug 2025 500 m away
Approved
12, SHEARWATER CLOSE, IG11 0GWConstruction of a single storey front extension to facilitate a front porch, construction of a single storey rear extension and conversion of existing garage into habitable space Barking & Dagenham 25/00664/HSE · Householder
May 2025 500 m away
Approved
Barking Riverside Development Site, RIVER ROADErection of a temporary Training Hub compound comprising ancillary site cabins, cement silo, covered external working area, materials storage area and perimeter hoardings with associated access, parking and landscapingBarking & Dagenham 25/00033/FULL · All Other
Jan 2025 300 m away
Approved
31, RIVERDALE CLOSE, IG11 0GQConstruction of a single storey rear extensionBarking & Dagenham 23/00086/HSE · Householder
Jan 2023 450 m away
Source: Planning London Datahub (Greater London Authority and the London boroughs); applications validated since January 2023. Data is published as received and may contain errors; check the borough's planning portal for documents.
Thames Gateway Park, Choats Road - Solar PanelsApproved, not yet built · 470 kW
Jun 2023 2.5 km away
Energy from waste
Connect Waste (Chequers Lane)Planning application in · 20 MW
Mar 2020 2.7 km away
Running nearest: Beckton STW Biodiesel Power Plant (biomass, 900 m); Beckton Gas Pressure Reduction Station (biomass, 1.2 km); Twin Tumps Way - Solar Panels (rooftop solar, 1.5 km); Beckton Sewage Treatment Works (wind farm, 2.0 km); Beckton STW Enhanced Sludge Digestion (other, 2.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Tilbury2Harbour Facilities · Site of the former Tilbury Power Station, approximately 1 km east of the existing Port of Tilbury
decided Feb 2019 20.4 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.