Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Maybank Road - Solar PanelsApproved, not yet built · 160 kW
Aug 2025 5.8 km away
Rooftop solar
Churchfields Junior School, Churchfields - Solar PanelsApproved, not yet built · 170 kW
Oct 2023 5.9 km away
Running nearest: Waltham Point Distribution Centre (rooftop solar, 5.4 km); Deephams Sewerage Treatment Works (anaerobic digestion, 6.9 km); Edmonton EcoPark EfW (energy from waste, 7.3 km); Advent Way - Solar Panels (rooftop solar, 7.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Staples Road, LoughtonHighway repair and maintenance works · ESSEX COUNTY COUNCIL · Some carriageway incursion
Oct 2026 to Oct 2026 350 m away
Minor
High Road, LoughtonUtility asset works · VIRGIN MEDIA · Some carriageway incursion
Oct 2026 to Oct 2026 400 m away
Minor
Old Station Road, LoughtonHighway improvement works · ESSEX COUNTY COUNCIL · Two-way signals
Oct 2026 to Oct 2026 450 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Other Pipe-lines · Between Belvedere, Bexley and Pimlico, Westminster
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.