Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
55hours of spills in 2025 between them (typical neighbourhood: about 36)
Delta Park Industrial Estate, Millmarsh Lane - Solar PanelsApproved, not yet built · 270 kW
Jul 2023 7.5 km away
Rooftop solar
Spire London East Hospital, Roding Lane South - Solar PanelsApproved, not yet built · 170 kW
Sept 2024 7.5 km away
Running nearest: Waltham Point Distribution Centre (rooftop solar, 7.3 km); Bower Park Academy - Solar Photovoltaic Panels (rooftop solar, 8.2 km); Deephams Sewerage Treatment Works (anaerobic digestion, 9.1 km); Edmonton EcoPark EfW (energy from waste, 9.4 km); Advent Way - Solar Panels (rooftop solar, 9.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Other Pipe-lines · Between Belvedere, Bexley and Pimlico, Westminster
Tilbury2Harbour Facilities · Site of the former Tilbury Power Station, approximately 1 km east of the existing Port of Tilbury
decided Feb 2019 29.7 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.