Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
55hours of spills in 2025 between them (typical neighbourhood: about 36)
Thrift Solar Farm and BESSApproved, not yet built · 30 MW
Dec 2025 7.2 km away
Battery storage
Thrift Solar Farm and BESSApproved, not yet built · 30 MW
Dec 2025 7.2 km away
Running nearest: Waltham Point Distribution Centre (rooftop solar, 6.4 km); Deephams Sewerage Treatment Works (anaerobic digestion, 8.9 km); Bower Park Academy - Solar Photovoltaic Panels (rooftop solar, 9.3 km); Edmonton EcoPark EfW (energy from waste, 9.3 km); Advent Way - Solar Panels (rooftop solar, 9.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Nov 2026 to Nov 2026 850 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Other Pipe-lines · Between Belvedere, Bexley and Pimlico, Westminster
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.