Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
14storm overflows within 2 km
1,028hours of spills in 2025 between them (typical neighbourhood: about 36)
274spill events counted
Yorkshire Water
Wistons Lane/Elland Link Csointo Canker Dyke47 spills, 540 hours in 2025
35 planned, approved or being built and 1 running (10 MW between them). Those within 5 km are on the map above.
Rooftop solar
Spire Elland Hospital - Solar PanelsApproved, not yet built · 180 kW
Apr 2025 550 m away
Battery storage
Lowfields Energy Storage ProjectApproved, not yet built · 50 MW
Mar 2023 650 m away
Rooftop solar
Lowfields Business Park, Lowfields Way - Solar PanelsApproved, not yet built · 620 kW
Aug 2023 750 m away
Battery storage
Ashday Hall Farm, Ashday Lane - Battery Energy StorageApproved, not yet built · 65 MW
Mar 2025 1.3 km away
Battery storage
Stainland Road, Salterhebble - Battery Storage FacilityApproved, not yet built · 25 MW
Sept 2021 2.5 km away
Rooftop solar
Huddersfield Royal Infirmary, Acre Street - Solar PanelsApproved, not yet built · 180 kW
Mar 2026 3.5 km away
Rooftop solar
Yorkshire Building Society, Plover Road - Solar PanelsApproved, not yet built · 170 kW
Jul 2023 3.6 km away
Rooftop solar
Aflex House, Dyson Wood Way - Solar PanelsApproved, not yet built · 890 kW
Jan 2023 3.7 km away
Rooftop solar
Aflex Hose, Dyson Wood Way - olar PanelsApproved, not yet built · 1 MW
Jun 2024 3.9 km away
Rooftop solar
Eureka, Discovery Road - Solar PanelsApproved, not yet built · 180 kW
Apr 2024 4.3 km away
Road and street works within 1 km
3 permitted works running now or planned, 3 of them major.
Major
Calderdale Way, EllandHighway repair and maintenance works · CALDERDALE METROPOLITAN BOROUGH COUNCIL · Lane closure
Aug 2026 to Oct 2026 900 m away
Major, planned
Jubilee Way, EllandHighway improvement works · CALDERDALE METROPOLITAN BOROUGH COUNCIL · Two-way signals
Sept 2026 to Oct 2026 900 m away
Major
Jubilee Way, EllandHighway improvement works · CALDERDALE METROPOLITAN BOROUGH COUNCIL · Two-way signals
Sept 2026 to Oct 2026 900 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Rastrick West: +28% over five years (2020 → 2025).
Council tax list: 190 homes added in the neighbourhood since April 2024.
Population (GP registrations): +3.6% in two years.