What's changing near HX3 8JW
Within 2 km, around Hipperholme in Calderdale. Building, planning, schools, transport, prices and crime.
82new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+1.8%like-for-like prices in Hipperholme, 2024 → 2025 (council +4.8%)
-16%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
21 new homes completed4 flats, 17 houses · Mar 2026 – Aug 2026
Aug 2026
1.3 km away - New homes
25 new homes completedhouses · Jul 2025 – Aug 2026
Aug 2026
1.1 km away - New homes
5 new homes completedflats · Jun 2026
Jun 2026
450 m away - New homes
14 new homes completedhouses · Apr 2026 – May 2026
May 2026
1.2 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 13 postcodes nearby had new homes completed in the last two years.
8homes extended 2021–2025, typically adding 44 m²
18since energy certificates began (2008)
2in HX3 8JW itself
- Extendedcertificate 2021
- Extendedcertificate 2011
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
9storm overflows within 2 km
1,206hours of spills in 2025 between them (typical neighbourhood: about 36)
332spill events counted
- Yorkshire Water
Wyke Beck Csointo Bottom Hall Beck72 spills, 357 hours in 2025
1.9 km away - Yorkshire Water
Bailiff Bridge Csointo Not Matched In Ea Consents Database62 spills, 311 hours in 2025
1.4 km away - Yorkshire Water
Red Lion A58 Csointo Wyke Beck73 spills, 257 hours in 2025
2.0 km away - Yorkshire Water
Coley Beck Csointo Not Matched In Ea Consents Database50 spills, 173 hours in 2025
1.1 km away - Yorkshire Water
Bailiff Bridge Csointo Wyke Beck32 spills, 55 hours in 2025
550 m away - Yorkshire Water
Woodfall Shelf East 2 Csointo Brow Lane Sewer22 spills, 26 hours in 2025
1.9 km away - Yorkshire Water
Bailiff Bridge Csointo Wyke Beck15 spills, 16 hours in 2025
2.0 km away - Yorkshire Water
Shibden Park Csointo Red Beck4 spills, 6 hours in 2025
1.8 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
49 planned, approved or being built and 2 running (28 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Appleton Academy, Woodside Road - Solar PanelsApproved, not yet built · 230 kW
Nov 2024
2.7 km away - Rooftop solar
Sainsburys, Wade Street - Solar PanelsApproved, not yet built · 840 kW
Jun 2026
3.2 km away - Rooftop solar
Eureka, Discovery Road - Solar PanelsApproved, not yet built · 180 kW
Apr 2024
3.3 km away - Battery storage
Ashday Hall Farm, Ashday Lane - Battery Energy StorageApproved, not yet built · 65 MW
Mar 2025
3.8 km away - Rooftop solar
Lowfields Business Park, Lowfields Way - Solar PanelsApproved, not yet built · 620 kW
Aug 2023
4.3 km away - Battery storage
Lowfields Energy Storage ProjectApproved, not yet built · 50 MW
Mar 2023
4.5 km away - Rooftop solar
Sedbergh Sports and Leisure Centre - Solar PV InstallationBeing built · 200 kW
Mar 2026
4.5 km away - Battery storage
Holmfield - Battery Energy StorageBeing built · 250 kW
Mar 2023
4.8 km away - Rooftop solar
Spire Elland Hospital - Solar PanelsApproved, not yet built · 180 kW
Apr 2025
5.0 km away - Battery storage
Stainland Road, Salterhebble - Battery Storage FacilityApproved, not yet built · 25 MW
Sept 2021
5.0 km away
Road and street works within 1 km
1 permitted works running now or planned, 1 of them major.
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire. application due November 2026
17.9 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Vine Street EfW (energy from waste, 8.6 km); Ovenden Moor (Repower) (wind farm, 9.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.