Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
3storm overflows within 2 km
54hours of spills in 2025 between them (typical neighbourhood: about 36)
40spill events counted
Yorkshire Water
Woodfall Shelf East 2 Csointo Brow Lane Sewer22 spills, 26 hours in 2025
1.2 km away
Yorkshire Water
Edge End Lane Csointo Blackshaw Beck16 spills, 23 hours in 2025
2.0 km away
Yorkshire Water
Lumbrook No 2 Csointo Lumb Brook Culverted2 spills, 5 hours in 2025
39 planned, approved or being built and 1 running (18 MW between them). Those within 5 km are on the map above.
Battery storage
Holmfield - Battery Energy StorageBeing built · 250 kW
Mar 2023 3.0 km away
Rooftop solar
Sainsburys, Wade Street - Solar PanelsApproved, not yet built · 840 kW
Jun 2026 3.2 km away
Battery storage
Holmfield Battery StorageApproved, not yet built · 500 MW
May 2025 3.4 km away
Biomass
Ernest Gill And Son, Holmfield Industrial Estate - Biomass BoilerApproved, not yet built · 190 kW
Sept 2022 3.4 km away
Battery storage
Holmfield Industrial Estate - Energy Storage FacilityApproved, not yet built
Oct 2025 3.5 km away
Rooftop solar
Appleton Academy, Woodside Road - Solar PanelsApproved, not yet built · 230 kW
Nov 2024 3.5 km away
Rooftop solar
Eureka, Discovery Road - Solar PanelsApproved, not yet built · 180 kW
Apr 2024 3.6 km away
Rooftop solar
Clayton Ce Primary School - Solar PanelsApproved, not yet built · 200 kW
Jan 2024 4.2 km away
Rooftop solar
Sedbergh Sports and Leisure Centre - Solar PV InstallationBeing built · 200 kW
Mar 2026 4.5 km away
Rooftop solar
St Matthews CE Primary School, Ivy House Road - Solar PanelsPlanning application in · 180 kW
Jun 2026 5.3 km away
Road and street works within 1 km
6 permitted works running now or planned, 6 of them major.
Major, planned
Cross Lane, HalifaxUtility repair and maintenance works · NORTHERN GAS NETWORKS · Some carriageway incursion
Nov 2026 to Nov 2026 200 m away
Major
Cross Lane, HalifaxUtility repair and maintenance works · NORTHERN GAS NETWORKS · Some carriageway incursion
Nov 2026 to Nov 2026 200 m away
Major
Brighouse And Denholme Gate Road, HalifaxUtility repair and maintenance works · NORTHERN GAS NETWORKS · Multi-way signals
Nov 2026 to Nov 2026 200 m away
Major, planned
Brighouse And Denholme Gate Road, HalifaxUtility repair and maintenance works · NORTHERN GAS NETWORKS · Some carriageway incursion
Nov 2026 to Nov 2026 200 m away
Major, planned
Halifax Road, HalifaxUtility repair and maintenance works · NORTHERN GAS NETWORKS · Some carriageway incursion
Nov 2026 to Nov 2026 250 m away
Major
Halifax Road, HalifaxUtility repair and maintenance works · NORTHERN GAS NETWORKS · Multi-way signals
Nov 2026 to Nov 2026 250 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire.
application due November 2026 16.3 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Northowram & Shelf: +27% over five years (2020 → 2025).
Council tax list: 20 homes added in the neighbourhood since April 2024.
Population (GP registrations): -0.5% in two years.