Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
15storm overflows within 2 km
2,172hours of spills in 2025 between them (typical neighbourhood: about 36)
350spill events counted
Yorkshire Water
Halifax Copley Stwinto River Calder And Hebble Brook74 spills, 784 hours in 2025
850 m away
Yorkshire Water
West Vale Csointo Black Brook78 spills, 587 hours in 2025
1.9 km away
Yorkshire Water
Halifax Copley Stwinto River Calder And Hebble Brook89 spills, 430 hours in 2025
250 m away
Yorkshire Water
Halifax Copley Stwinto River Calder And Hebble Brook38 spills, 245 hours in 2025
650 m away
Yorkshire Water
West Valeinto River Calder21 spills, 59 hours in 2025
1.9 km away
Yorkshire Water
Hoyles Memorial Gardens Csointo Black Brook27 spills, 42 hours in 2025
1.7 km away
Yorkshire Water
Copley Village Spsinto River Calder1 spills, 8 hours in 2025
1.3 km away
Yorkshire Water
Brow Bridge Csointo Black Brook8 spills, 7 hours in 2025
34 planned, approved or being built and 2 running (28 MW between them). Those within 5 km are on the map above.
Battery storage
Stainland Road, Salterhebble - Battery Storage FacilityApproved, not yet built · 25 MW
Sept 2021 850 m away
Rooftop solar
Eureka, Discovery Road - Solar PanelsApproved, not yet built · 180 kW
Apr 2024 1.9 km away
Battery storage
Lowfields Energy Storage ProjectApproved, not yet built · 50 MW
Mar 2023 2.4 km away
Rooftop solar
Spire Elland Hospital - Solar PanelsApproved, not yet built · 180 kW
Apr 2025 2.4 km away
Rooftop solar
Sainsburys, Wade Street - Solar PanelsApproved, not yet built · 840 kW
Jun 2026 2.5 km away
Rooftop solar
Lowfields Business Park, Lowfields Way - Solar PanelsApproved, not yet built · 620 kW
Aug 2023 2.5 km away
Battery storage
Ashday Hall Farm, Ashday Lane - Battery Energy StorageApproved, not yet built · 65 MW
Mar 2025 2.6 km away
Rooftop solar
Ryburn Valley High School, St Peters Avenue - Solar PanelsApproved, not yet built · 260 kW
Sept 2024 5.0 km away
Rooftop solar
Yorkshire Building Society, Plover Road - Solar PanelsApproved, not yet built · 170 kW
Jul 2023 5.8 km away
Rooftop solar
Huddersfield Royal Infirmary, Acre Street - Solar PanelsApproved, not yet built · 180 kW
Mar 2026 5.9 km away
Road and street works within 1 km
3 permitted works running now or planned, 1 of them major.
Major
Godfrey Road, HalifaxHighway improvement works · CALDERDALE METROPOLITAN BOROUGH COUNCIL · Road closure
Oct 2026 to Oct 2026 150 m away
Minor
Green Park Avenue, HalifaxUtility repair and maintenance works · YORKSHIRE WATER · No carriageway incursion
Oct 2026 to Oct 2026 200 m away
Minor
Dudwell Lane, HalifaxUtility repair and maintenance works · YORKSHIRE WATER · No carriageway incursion
Oct 2026 to Oct 2026 450 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Skircoat Green: +26% over five years (2020 → 2025).
Council tax list: 0 homes added in the neighbourhood since April 2024.
Population (GP registrations): -0.4% in two years.