What's changing near HX3 0QR
Within 2 km, around Southowram & Siddal in Calderdale. Building, planning, schools, transport, prices and crime.
18new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+7.3%like-for-like prices in Southowram & Siddal, 2024 → 2025 (council +4.8%)
-13%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
New-home postcodes with fewer than 5 homes are counted above but not listed. 7 postcodes nearby had new homes completed in the last two years.
18homes extended 2021–2025, typically adding 27 m²
32since energy certificates began (2008)
0in HX3 0QR itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
21storm overflows within 2 km
1,983hours of spills in 2025 between them (typical neighbourhood: about 36)
446spill events counted
- Yorkshire Water
Halifax Copley Stwinto River Calder And Hebble Brook74 spills, 784 hours in 2025
1.1 km away - Yorkshire Water
Halifax Copley Stwinto River Calder And Hebble Brook89 spills, 430 hours in 2025
400 m away - Yorkshire Water
Halifax Copley Stwinto River Calder And Hebble Brook38 spills, 245 hours in 2025
800 m away - Yorkshire Water
Huddersfield Road 106 Csointo Canker Dyke77 spills, 180 hours in 2025
2.0 km away - Yorkshire Water
Huddersfield Road/South Lane Csointo Canker Dyke47 spills, 91 hours in 2025
2.0 km away - Yorkshire Water
Elland Lowfields Spsinto River Calder38 spills, 89 hours in 2025
1.9 km away - Yorkshire Water
West Valeinto River Calder21 spills, 59 hours in 2025
2.0 km away - Yorkshire Water
Hoyles Memorial Gardens Csointo Black Brook27 spills, 42 hours in 2025
1.8 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
36 planned, approved or being built and 2 running (28 MW between them). Those within 5 km are on the map above.
- Battery storage
Stainland Road, Salterhebble - Battery Storage FacilityApproved, not yet built · 25 MW
Sept 2021
950 m away - Rooftop solar
Eureka, Discovery Road - Solar PanelsApproved, not yet built · 180 kW
Apr 2024
1.8 km away - Battery storage
Lowfields Energy Storage ProjectApproved, not yet built · 50 MW
Mar 2023
2.2 km away - Rooftop solar
Spire Elland Hospital - Solar PanelsApproved, not yet built · 180 kW
Apr 2025
2.3 km away - Rooftop solar
Lowfields Business Park, Lowfields Way - Solar PanelsApproved, not yet built · 620 kW
Aug 2023
2.3 km away - Battery storage
Ashday Hall Farm, Ashday Lane - Battery Energy StorageApproved, not yet built · 65 MW
Mar 2025
2.4 km away - Rooftop solar
Sainsburys, Wade Street - Solar PanelsApproved, not yet built · 840 kW
Jun 2026
2.4 km away - Rooftop solar
Ryburn Valley High School, St Peters Avenue - Solar PanelsApproved, not yet built · 260 kW
Sept 2024
5.3 km away - Rooftop solar
Yorkshire Building Society, Plover Road - Solar PanelsApproved, not yet built · 170 kW
Jul 2023
5.8 km away - Rooftop solar
Huddersfield Royal Infirmary, Acre Street - Solar PanelsApproved, not yet built · 180 kW
Mar 2026
5.9 km away
Road and street works within 1 km
4 permitted works running now or planned, 1 of them major.
- Major
Godfrey Road, HalifaxHighway improvement works · CALDERDALE METROPOLITAN BOROUGH COUNCIL · Road closure
Oct 2026 to Oct 2026
400 m away - Standard
Higgin Lane, HalifaxNew service connection · NORTHERN POWERGRID (YORKSHIRE) PLC · Some carriageway incursion
Oct 2026 to Oct 2026
950 m away - Minor
Green Park Avenue, HalifaxUtility repair and maintenance works · YORKSHIRE WATER · No carriageway incursion
Oct 2026 to Oct 2026
450 m away - Minor
Dudwell Lane, HalifaxUtility repair and maintenance works · YORKSHIRE WATER · No carriageway incursion
Oct 2026 to Oct 2026
700 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire. application due November 2026
17.2 km away - Decideddecided Nov 2022
29.1 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Vine Street EfW (energy from waste, 7.2 km); Ovenden Moor (Repower) (wind farm, 9.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.