What's changing near HX1 4QU
Within 2 km, around Pellon West & Highroad Well in Calderdale. Building, planning, schools, transport, prices and crime.
143new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+7.7%like-for-like prices in Pellon West & Highroad Well, 2024 → 2025 (council +4.8%)
+6%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
14 new homes completedhouses · Feb 2026 – Oct 2026
planned Oct 2026
1.1 km away - New homes
6 new homes completedhouses · Apr 2026 – Aug 2026
Aug 2026
1.1 km away - New homes
6 new homes completedhouses · Feb 2026 – Jun 2026
Jun 2026
1.1 km away - New homes
36 new homes completedflats · Dec 2025
Dec 2025
650 m away - New homes
61 new homes completedflats · Apr 2025
May 2025
1.5 km away - New homes
14 new homes completedhouses · Mar 2025
Mar 2025
1.7 km away - New schoolSept 2022
550 m away - New schoolDec 2020
1.9 km away - New schoolSept 2020
800 m away
New-home postcodes with fewer than 5 homes are counted above but not listed. 10 postcodes nearby had new homes completed in the last two years.
26homes extended 2021–2025, typically adding 25 m²
321since energy certificates began (2008)
0in HX1 4QU itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
12storm overflows within 2 km
1,517hours of spills in 2025 between them (typical neighbourhood: about 36)
332spill events counted
- Yorkshire Water
Hebble Lane Csointo Hebble Brook116 spills, 1,170 hours in 2025
850 m away - Yorkshire Water
Raglan Street Csointo Hebble Brook (Culverted)65 spills, 132 hours in 2025
900 m away - Yorkshire Water
Wakefield Road 90 Csointo Calder+Hebble Navigation Canal39 spills, 69 hours in 2025
1.9 km away - Yorkshire Water
Mount Pellon Csointo Hebble Brook Culverted60 spills, 55 hours in 2025
750 m away - Yorkshire Water
Dene Place No 2 Csointo Hebble Brook25 spills, 38 hours in 2025
1.6 km away - Yorkshire Water
Sowerby Bridge Sewage Pumping Stninto River Calder8 spills, 27 hours in 2025
1.8 km away - Yorkshire Water
Ovenden Road Csointo Ovenden Brook (Culverted)13 spills, 22 hours in 2025
1.3 km away - Yorkshire Water
Boy Lane Csointo Hebble Brook5 spills, 5 hours in 2025
1.8 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
24 planned, approved or being built and 1 running (18 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Sainsburys, Wade Street - Solar PanelsApproved, not yet built · 840 kW
Jun 2026
2.0 km away - Rooftop solar
Eureka, Discovery Road - Solar PanelsApproved, not yet built · 180 kW
Apr 2024
2.2 km away - Battery storage
Holmfield Industrial Estate - Energy Storage FacilityApproved, not yet built
Oct 2025
3.8 km away - Biomass
Ernest Gill And Son, Holmfield Industrial Estate - Biomass BoilerApproved, not yet built · 190 kW
Sept 2022
3.8 km away - Battery storage
Holmfield Battery StorageApproved, not yet built · 500 MW
May 2025
3.8 km away - Battery storage
Stainland Road, Salterhebble - Battery Storage FacilityApproved, not yet built · 25 MW
Sept 2021
3.8 km away - Rooftop solar
Ryburn Valley High School, St Peters Avenue - Solar PanelsApproved, not yet built · 260 kW
Sept 2024
3.9 km away - Battery storage
Holmfield - Battery Energy StorageBeing built · 250 kW
Mar 2023
4.0 km away - Battery storage
Lowfields Energy Storage ProjectApproved, not yet built · 50 MW
Mar 2023
5.5 km away - Battery storage
Ashday Hall Farm, Ashday Lane - Battery Energy StorageApproved, not yet built · 65 MW
Mar 2025
5.5 km away
Road and street works within 1 km
15 permitted works running now or planned, 5 of them major.
- Major
Gibraltar Road, HalifaxHighway improvement works · CALDERDALE METROPOLITAN BOROUGH COUNCIL · Some carriageway incursion
Oct 2026 to Oct 2026
500 m away - Major
Langdale Crescent, HalifaxUtility repair and maintenance works · NORTHERN GAS NETWORKS · Some carriageway incursion
Jan 2027 to Feb 2027
800 m away - Major
Hebble Lane, HalifaxUtility repair and maintenance works · NORTHERN GAS NETWORKS · Multi-way signals
Oct 2026 to Nov 2026
900 m away - Major
Shroggs Road, HalifaxUtility repair and maintenance works · NORTHERN GAS NETWORKS · Multi-way signals
Nov 2026 to Dec 2026
950 m away - Major
Long Lane, HalifaxUtility repair and maintenance works · NORTHERN GAS NETWORKS · Multi-way signals
Oct 2026 to Nov 2026
1000 m away - Standard
Gibbet Street, HalifaxRemedial works · CITYFIBRE METRO NETWORKS LTD · Give and take
Oct 2026 to Oct 2026
400 m away - Standard
Rosebery Terrace, HalifaxUtility repair and maintenance works · YORKSHIRE WATER · Give and take
Oct 2026 to Oct 2026
550 m away - Standard
Sandbeds Road, HalifaxHighway repair and maintenance works · CALDERDALE METROPOLITAN BOROUGH COUNCIL · Road closure
Oct 2026 to Nov 2026
700 m away - Standard
Hopwood Lane, HalifaxUtility repair and maintenance works · VIRGIN MEDIA · Some carriageway incursion
Oct 2026 to Oct 2026700 m away
Major infrastructure projects within 30 km
- Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire. application due November 2026
13.9 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.