24 planned, approved or being built and 2 running (28 MW between them). Those within 5 km are on the map above.
Rooftop solar
Eureka, Discovery Road - Solar PanelsApproved, not yet built · 180 kW
Apr 2024 1.6 km away
Rooftop solar
Sainsburys, Wade Street - Solar PanelsApproved, not yet built · 840 kW
Jun 2026 1.7 km away
Battery storage
Stainland Road, Salterhebble - Battery Storage FacilityApproved, not yet built · 25 MW
Sept 2021 3.1 km away
Rooftop solar
Ryburn Valley High School, St Peters Avenue - Solar PanelsApproved, not yet built · 260 kW
Sept 2024 3.9 km away
Battery storage
Holmfield Industrial Estate - Energy Storage FacilityApproved, not yet built
Oct 2025 4.3 km away
Biomass
Ernest Gill And Son, Holmfield Industrial Estate - Biomass BoilerApproved, not yet built · 190 kW
Sept 2022 4.3 km away
Battery storage
Holmfield Battery StorageApproved, not yet built · 500 MW
May 2025 4.3 km away
Battery storage
Holmfield - Battery Energy StorageBeing built · 250 kW
Mar 2023 4.4 km away
Battery storage
Lowfields Energy Storage ProjectApproved, not yet built · 50 MW
Mar 2023 4.7 km away
Battery storage
Ashday Hall Farm, Ashday Lane - Battery Energy StorageApproved, not yet built · 65 MW
Mar 2025 4.8 km away
Road and street works within 1 km
11 permitted works running now or planned, 2 of them major.
Major
Gibraltar Road, HalifaxHighway improvement works · CALDERDALE METROPOLITAN BOROUGH COUNCIL · Some carriageway incursion
Oct 2026 to Oct 2026 850 m away
Major
Plane Tree Nest Lane, HalifaxUtility repair and maintenance works · NORTHERN GAS NETWORKS · Road closure
Jan 2027 to Mar 2027 900 m away
Standard
Hopwood Lane, HalifaxUtility repair and maintenance works · VIRGIN MEDIA · Some carriageway incursion
Oct 2026 to Oct 2026 50 m away
Standard
Heywood Place, HalifaxDisconnection or alteration of supply · NORTHERN POWERGRID (YORKSHIRE) PLC · Give and take
Nov 2026 to Nov 2026 600 m away
Standard
Gibbet Street, HalifaxRemedial works · CITYFIBRE METRO NETWORKS LTD · Give and take
Oct 2026 to Oct 2026 750 m away
Standard
Rosebery Terrace, HalifaxUtility repair and maintenance works · YORKSHIRE WATER · Give and take
Oct 2026 to Oct 2026 900 m away
Minor
St Augustines Terrace, HalifaxUtility repair and maintenance works · YORKSHIRE WATER · No carriageway incursion
Oct 2026 to Oct 2026 700 m away
Minor
Violet Street North Footpath, HalifaxUtility repair and maintenance works · YORKSHIRE WATER · No carriageway incursion
Oct 2026 to Oct 2026 700 m away
Minor
Newstead Avenue, HalifaxRemedial works · CITYFIBRE METRO NETWORKS LTD · Give and take
Oct 2026 to Oct 2026 750 m away
Major infrastructure projects within 30 km
Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire.
application due November 2026 14.7 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Pellon East: +7% over five years (2020 → 2025).
Council tax list: 10 homes added in the neighbourhood since April 2024.
Population (GP registrations): -0.5% in two years.
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Rooftop solar
Lowfields Business Park, Lowfields Way - Solar PanelsApproved, not yet built · 620 kW
Aug 2023 4.8 km away
Rooftop solar
Spire Elland Hospital - Solar PanelsApproved, not yet built · 180 kW
Apr 2025 4.8 km away
Running nearest: Ovenden Moor (Repower) (wind farm, 7.4 km); Vine Street EfW (energy from waste, 9.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Minor
Clarence Street, HalifaxRemedial works · CITYFIBRE METRO NETWORKS LTD · Some carriageway incursion
Oct 2026 to Oct 2026 800 m away
Minor
Dyson Road, HalifaxUtility repair and maintenance works · YORKSHIRE WATER · No carriageway incursion
Oct 2026 to Oct 2026 850 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.