What's changing near HX1 3YA
Within 2 km, around King Cross in Calderdale. Building, planning, schools, transport, prices and crime.
127new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
-3.7%like-for-like prices in King Cross, 2024 → 2025 (council +4.8%)
-8%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
12 new homes completedhouses · Feb 2026 – Sep 2026
Sept 2026
1.5 km away - New homes
6 new homes completedhouses · Apr 2026 – Aug 2026
Aug 2026
1.5 km away - New homes
6 new homes completedhouses · Feb 2026 – Jun 2026
Jun 2026
1.5 km away - New homes
36 new homes completedflats · Dec 2025
Dec 2025
650 m away - New homes
61 new homes completedflats · Apr 2025
May 2025
1.3 km away - New schoolSept 2022
700 m away - New schoolDec 2020
1.5 km away - New schoolSept 2020
550 m away
New-home postcodes with fewer than 5 homes are counted above but not listed. 9 postcodes nearby had new homes completed in the last two years.
35homes extended 2021–2025, typically adding 27 m²
382since energy certificates began (2008)
7in HX1 3YA itself
- Extendedcertificate 2015
- Extendedcertificate 2015
- Extendedcertificate 2014
- Extendedcertificate 2014
- Extendedcertificate 2014
- Extended
Storm overflows within 2 km
14storm overflows within 2 km
1,706hours of spills in 2025 between them (typical neighbourhood: about 36)
427spill events counted
- Yorkshire Water
Hebble Lane Csointo Hebble Brook116 spills, 1,170 hours in 2025
1.5 km away - Yorkshire Water
Wharfe House Csointo River Calder65 spills, 145 hours in 2025
1.8 km away - Yorkshire Water
Raglan Street Csointo Hebble Brook (Culverted)65 spills, 132 hours in 2025
1.2 km away - Yorkshire Water
Wakefield Road 90 Csointo Calder+Hebble Navigation Canal39 spills, 69 hours in 2025
1.3 km away - Yorkshire Water
Mount Pellon Csointo Hebble Brook Culverted60 spills, 55 hours in 2025
1.3 km away - Yorkshire Water
Back Wharf Street Csointo River Calder33 spills, 43 hours in 2025
2.0 km away - Yorkshire Water
Dene Place No 2 Csointo Hebble Brook25 spills, 38 hours in 2025
1.6 km away - Yorkshire Water
Sowerby Bridge Sewage Pumping Stninto River Calder8 spills, 27 hours in 2025
1.3 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
22 planned, approved or being built and 2 running (28 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Eureka, Discovery Road - Solar PanelsApproved, not yet built · 180 kW
Apr 2024
1.9 km away - Rooftop solar
Sainsburys, Wade Street - Solar PanelsApproved, not yet built · 840 kW
Jun 2026
1.9 km away - Battery storage
Stainland Road, Salterhebble - Battery Storage FacilityApproved, not yet built · 25 MW
Sept 2021
3.2 km away - Rooftop solar
Ryburn Valley High School, St Peters Avenue - Solar PanelsApproved, not yet built · 260 kW
Sept 2024
3.7 km away - Battery storage
Holmfield Industrial Estate - Energy Storage FacilityApproved, not yet built
Oct 2025
4.4 km away - Biomass
Ernest Gill And Son, Holmfield Industrial Estate - Biomass BoilerApproved, not yet built · 190 kW
Sept 2022
4.4 km away - Battery storage
Holmfield Battery StorageApproved, not yet built · 500 MW
May 2025
4.4 km away - Battery storage
Holmfield - Battery Energy StorageBeing built · 250 kW
Mar 2023
4.5 km away - Battery storage
Lowfields Energy Storage ProjectApproved, not yet built · 50 MW
Mar 2023
4.9 km away - Rooftop solar
Spire Elland Hospital - Solar PanelsApproved, not yet built · 180 kW
Apr 2025
5.0 km away
Road and street works within 1 km
10 permitted works running now or planned, 2 of them major.
- Major
Gibraltar Road, HalifaxHighway improvement works · CALDERDALE METROPOLITAN BOROUGH COUNCIL · Some carriageway incursion
Oct 2026 to Oct 2026
600 m away - Major
Plane Tree Nest Lane, HalifaxUtility repair and maintenance works · NORTHERN GAS NETWORKS · Road closure
Jan 2027 to Mar 2027
650 m away - Standard
Hopwood Lane, HalifaxUtility repair and maintenance works · VIRGIN MEDIA · Some carriageway incursion
Oct 2026 to Oct 2026
250 m away - Standard
Gibbet Street, HalifaxRemedial works · CITYFIBRE METRO NETWORKS LTD · Give and take
Oct 2026 to Oct 2026
500 m away - Standard
Heywood Place, HalifaxDisconnection or alteration of supply · NORTHERN POWERGRID (YORKSHIRE) PLC · Give and take
Nov 2026 to Nov 2026
800 m away - Standard
Rosebery Terrace, HalifaxUtility repair and maintenance works · YORKSHIRE WATER · Give and take
Oct 2026 to Oct 2026
1000 m away - Minor
Newstead Avenue, HalifaxRemedial works · CITYFIBRE METRO NETWORKS LTD · Give and take
Oct 2026 to Oct 2026
550 m away - Minor
St Augustines Terrace, HalifaxUtility repair and maintenance works · YORKSHIRE WATER · No carriageway incursion
Oct 2026 to Oct 2026
800 m away - Minor
Violet Street North Footpath, HalifaxUtility repair and maintenance works · YORKSHIRE WATER · No carriageway incursion
Oct 2026 to Oct 2026
850 m away
Major infrastructure projects within 30 km
- Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire. application due November 2026
14.5 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Running nearest: Ovenden Moor (Repower) (wind farm, 7.4 km); Vine Street EfW (energy from waste, 9.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.