Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
15storm overflows within 2 km
1,675hours of spills in 2025 between them (typical neighbourhood: about 36)
403spill events counted
Yorkshire Water
Hebble Lane Csointo Hebble Brook116 spills, 1,170 hours in 2025
1.7 km away
Yorkshire Water
Wharfe House Csointo River Calder65 spills, 145 hours in 2025
1.9 km away
Yorkshire Water
Raglan Street Csointo Hebble Brook (Culverted)65 spills, 132 hours in 2025
24 planned, approved or being built and 2 running (28 MW between them). Those within 5 km are on the map above.
Rooftop solar
Eureka, Discovery Road - Solar PanelsApproved, not yet built · 180 kW
Apr 2024 1.6 km away
Rooftop solar
Sainsburys, Wade Street - Solar PanelsApproved, not yet built · 840 kW
Jun 2026 1.7 km away
Battery storage
Stainland Road, Salterhebble - Battery Storage FacilityApproved, not yet built · 25 MW
Sept 2021 2.9 km away
Rooftop solar
Ryburn Valley High School, St Peters Avenue - Solar PanelsApproved, not yet built · 260 kW
Sept 2024 3.9 km away
Battery storage
Holmfield Industrial Estate - Energy Storage FacilityApproved, not yet built
Oct 2025 4.5 km away
Biomass
Ernest Gill And Son, Holmfield Industrial Estate - Biomass BoilerApproved, not yet built · 190 kW
Sept 2022 4.5 km away
Battery storage
Holmfield Battery StorageApproved, not yet built · 500 MW
May 2025 4.5 km away
Battery storage
Lowfields Energy Storage ProjectApproved, not yet built · 50 MW
Mar 2023 4.6 km away
Battery storage
Holmfield - Battery Energy StorageBeing built · 250 kW
Mar 2023 4.6 km away
Battery storage
Ashday Hall Farm, Ashday Lane - Battery Energy StorageApproved, not yet built · 65 MW
Mar 2025 4.7 km away
Road and street works within 1 km
9 permitted works running now or planned, 2 of them major.
Major
Plane Tree Nest Lane, HalifaxUtility repair and maintenance works · NORTHERN GAS NETWORKS · Road closure
Jan 2027 to Mar 2027 850 m away
Major
Gibraltar Road, HalifaxHighway improvement works · CALDERDALE METROPOLITAN BOROUGH COUNCIL · Some carriageway incursion
Oct 2026 to Oct 2026 900 m away
Standard
Hopwood Lane, HalifaxUtility repair and maintenance works · VIRGIN MEDIA · Some carriageway incursion
Oct 2026 to Oct 2026 250 m away
Standard
Heywood Place, HalifaxDisconnection or alteration of supply · NORTHERN POWERGRID (YORKSHIRE) PLC · Give and take
Nov 2026 to Nov 2026 750 m away
Standard
Gibbet Street, HalifaxRemedial works · CITYFIBRE METRO NETWORKS LTD · Give and take
Oct 2026 to Oct 2026 800 m away
Minor
Newstead Avenue, HalifaxRemedial works · CITYFIBRE METRO NETWORKS LTD · Give and take
Oct 2026 to Oct 2026 850 m away
Minor
St Augustines Terrace, HalifaxUtility repair and maintenance works · YORKSHIRE WATER · No carriageway incursion
Oct 2026 to Oct 2026 850 m away
Minor
Clarence Street, HalifaxRemedial works · CITYFIBRE METRO NETWORKS LTD · Some carriageway incursion
Oct 2026 to Oct 2026 900 m away
Minor
Violet Street North Footpath, HalifaxUtility repair and maintenance works · YORKSHIRE WATER · No carriageway incursion
Oct 2026 to Oct 2026 900 m away
Major infrastructure projects within 30 km
Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire.
application due November 2026 14.8 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in King Cross: +28% over five years (2020 → 2025).
Council tax list: 0 homes added in the neighbourhood since April 2024.
Population (GP registrations): +0.4% in two years.