Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
SDC M40 CampusGenerating Stations · The site of the project is located in Buckinghamshire, England. It is approximately 2km to the west of Gerrards Cross, approximately 2.5km east of Beaconsfield and approximately 1.5km north of Hedgerley. The site comprises land immediately to the south of the A40 Oxford Road and immediately to the north of the M40 motorway. It has a history of landfill activities and is currently operated by Veolia for the landfilling of inert building waste (albeit the site no longer accepts any forms of waste).
application due January 2027 25.1 km away
Decided
Millbrook PowerGenerating Stations · The Rookery Pit Near Stewartby, Bedfordshire
G Park, Maxted Road - Solar PanelsApproved, not yet built · 770 kW
Sept 2025 9.9 km away
Running nearest: Long Meadow Farm (solar farm, 7.1 km); Great Seabrook Farm (solar farm, 7.4 km); Caddington Solar Farm (Phase 2) (solar farm, 8.0 km); Church Farm (solar farm, 8.3 km); Caddington Solar Farm (Phase 1) (solar farm, 8.5 km).
Recommendation
Rosefield Solar FarmGenerating Stations · Four land parcels to the south and west of the East Claydon substation, Bucks.
application due September 2025 27.9 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.