What's changing near HP2 5QD
Within 2 km, around Highfield in Dacorum. Building, planning, schools, transport, prices and crime.
179new homes completed within 2 km, last 2 years
169homes given permission on brownfield sites since 2021
+3.2%like-for-like prices in Highfield, 2024 → 2025 (council +2.4%)
-9%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedSchool openedExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
9 new homes completed4 flats, 5 houses · Aug 2025 – Apr 2026
Apr 2026
1.3 km away - New homes
34 new homes completedflats · Oct 2025
Oct 2025
1.5 km away - New homes
11 new homes completedflats · Oct 2025
Oct 2025
2.0 km away - New homes
31 new homes completed17 flats, 14 houses · Oct 2025
Oct 2025
1.3 km away - New homes
5 new homes completedhouses · Jul 2025
Jul 2025
1.3 km away - New homes
5 new homes completed3 flats, 2 houses · Jun 2025
Jun 2025
2.0 km away - New homes
17 new homes completedflats · Feb 2025
Feb 2025
1.4 km away - New homes
58 new homes completedflats · Nov 2024
Dec 2024
1.4 km away - Planning permissionAug 2021
1.6 km away - New schoolMay 2021
1.3 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 15 postcodes nearby had new homes completed in the last two years.
13homes extended 2021–2025, typically adding 23 m²
23since energy certificates began (2008)
3in HP2 5QD itself
- Extendedcertificate 2024
- Extendedcertificate 2021
- Extendedcertificate 2021
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
23 planned, approved or being built and 2 running (590 kW between them). Those within 5 km are on the map above.
- Battery storage
Verge By Hemel Stags Rugby Club, Pennine Way - Micro Energy StorageApproved, not yet built · 200 kW
Apr 2025
1000 m away - Rooftop solar
Century House, Maylands Avenue - Solar PV PanelsApproved, not yet built · 720 kW
Mar 2023
1.5 km away - Rooftop solar
G Park Maxted Road - Solar PanelsApproved, not yet built · 1 MW
Jul 2022
1.8 km away - Rooftop solar
G Park, Maxted Road - Solar PanelsApproved, not yet built · 770 kW
Sept 2025
1.8 km away - Rooftop solar
The Snowcentre, St Albans Hill - Solar PanelsApproved, not yet built · 850 kW
May 2024
1.9 km away - Rooftop solar
Dacorum Sports Centre, Park Road - Solar PV PanelsApproved, not yet built · 320 kW
Nov 2024
2.0 km away - Battery storage
The End Of Taransey, Taransay - Energy Storage SystemApproved, not yet built · 200 kW
Jul 2025
2.5 km away - Rooftop solar
London Road Retail Park, Unit A - Solar PanelsApproved, not yet built · 150 kW
Apr 2026
2.7 km away - Solar farm
Little Heath Lane - Solar PV ArrayPlanning application in · 25 MW
Apr 2022
4.8 km away - Biomass
Appspond Lane Energy PlantApproved, not yet built
Mar 2021
4.9 km away
Road and street works within 1 km
8 permitted works running now or planned, 3 of them major.
- Major
Manley Road, Hemel HempsteadHighway repair and maintenance works · HERTFORDSHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026
500 m away - Major
Temple Mead, Hemel HempsteadHighway repair and maintenance works · HERTFORDSHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026
650 m away - Major
Alexandra Road, Hemel HempsteadUtility repair and maintenance works · AFFINITY WATER - C · Road closure
Nov 2026 to Nov 2026
950 m away - Standard
Adeyfield Road, Hemel HempsteadUtility asset works · EE Ltd · Multi-way signals
Oct 2026 to Oct 2026
700 m away - Standard
Christchurch Road, Hemel HempsteadNew service connection · CADENT GAS LIMITED · Give and take
Oct 2026 to Oct 2026
750 m away - Standard
High Street, Hemel HempsteadDisconnection or alteration of supply · CADENT GAS LIMITED · Some carriageway incursion
Oct 2026 to Oct 2026
900 m away - Standard
Hillary Road, Hemel HempsteadHighway improvement works · HERTFORDSHIRE COUNTY COUNCIL · Give and take
Oct 2026 to Oct 2026
950 m away - Minor
Trebellan Drive, Hemel HempsteadHighway repair and maintenance works · HERTFORDSHIRE COUNTY COUNCIL · Stop/go boards
Oct 2026 to Oct 2026
450 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Oct 2013
11.3 km away - Decideddecided Apr 2025
14.0 km away - Decideddecided Sept 2014
16.8 km away - Pre-application
SDC M40 CampusGenerating Stations · The site of the project is located in Buckinghamshire, England. It is approximately 2km to the west of Gerrards Cross, approximately 2.5km east of Beaconsfield and approximately 1.5km north of Hedgerley. The site comprises land immediately to the south of the A40 Oxford Road and immediately to the north of the M40 motorway. It has a history of landfill activities and is currently operated by Veolia for the landfilling of inert building waste (albeit the site no longer accepts any forms of waste). application due January 2027
21.5 km away - Decideddecided Nov 2023
28.9 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Iron Mountain Site (rooftop solar, 900 m); Woodside Leisure Centre - Solar PV Panels (rooftop solar, 8.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.