What's changing near HP23 6AD
Within 2 km, around Tring West & Long Marston in Dacorum. Building, planning, schools, transport, prices and crime.
43new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+7.0%like-for-like prices in Tring West & Long Marston, 2024 → 2025 (council +2.4%)
-4%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
New-home postcodes with fewer than 5 homes are counted above but not listed. 13 postcodes nearby had new homes completed in the last two years.
19homes extended 2021–2025, typically adding 26 m²
33since energy certificates began (2008)
0in HP23 6AD itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
0hours of spills in 2025 between them (typical neighbourhood: about 36)
0spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
8 planned, approved or being built and 7 running (63 MW between them). Those within 5 km are on the map above.
- Battery storage
Stablebridge Road, Aston Clinton - Battery StorageApproved, not yet built · 200 kW
Feb 2026
3.5 km away - Rooftop solar
Safren Power Uk Limited - Solar PhotovoltaicApproved, not yet built · 990 kW
Jul 2022
4.0 km away - Rooftop solar
Bellingdon Brickworks, Chesham Road - Solar PanelsApproved, not yet built · 330 kW
Jan 2026
5.3 km away - Rooftop solar
Ashlyns Nursing Home, Chesham Road - Solar PanelsApproved, not yet built · 160 kW
Sept 2025
8.1 km away - Solar farm
Hale Solar FarmPlanning application in · 40 MW
Mar 2020
8.2 km away - Solar farm
Straws Hadley Solar FarmApproved, not yet built · 50 MW
Dec 2024
8.7 km away - Solar farm
Bury Farm - Solar FarmApproved, not yet built · 50 MW
Jul 2022
9.7 km away - Solar farm
Ledburn, Mentmore - Solar FarmApproved, not yet built · 50 MW
Dec 2025
9.9 km away
Running nearest: Gib Lane (Aston Clinton solar park) (solar farm, 5.3 km); Long Meadow Farm (solar farm, 5.9 km); Arla Dairy Site (anaerobic digestion, 6.1 km); Gib Lane Solar farm (Extension) (solar farm, 6.4 km); Great Seabrook Farm (solar farm, 6.4 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Road and street works within 1 km
13 permitted works running now or planned, 1 of them major.
- Major, planned
London Road, TringHighway repair and maintenance works · HERTFORDSHIRE COUNTY COUNCIL · Road closure
Feb 2027 to Mar 2027
850 m away - Standard
Mortimer Hill, TringNew service connection · UK POWER NETWORKS EASTERN & LONDON · Multi-way signals
Oct 2026 to Oct 2026
400 m away - Standard
Mill Gardens, TringRemedial works · HERTFORDSHIRE COUNTY COUNCIL · Give and take
Oct 2026 to Oct 2026
450 m away - Immediate - urgent
Tring Town Footpath 037, TringHighway repair and maintenance works · HERTFORDSHIRE COUNTY COUNCIL · No carriageway incursion
Jun 2026 to Oct 2026
100 m away - Minor
Akeman Street, TringUtility repair and maintenance works · THAMES WATER · Some carriageway incursion
Oct 2026 to Oct 2026
200 m away - Minor
Goldfield Road, TringUtility asset works · THAMES WATER · Some carriageway incursion
Oct 2026 to Nov 2026
450 m away - Minor
Miswell Lane, TringUtility asset works · THAMES WATER · Give and take
Oct 2026 to Nov 2026
600 m away - Immediate - urgent
Tring Town Footpath 041, TringHighway repair and maintenance works · HERTFORDSHIRE COUNTY COUNCIL · No carriageway incursion
Sept 2026 to Oct 2026
650 m away - Minor
Barbers Walk, TringUtility asset works · THAMES WATER · Some carriageway incursion
Oct 2026 to Nov 2026
650 m away
Major infrastructure projects within 30 km
- Decideddecided Sept 2014
17.2 km away - Decideddecided Oct 2013
18.5 km away - Decideddecided Apr 2025
21.9 km away - Recommendation
Rosefield Solar FarmGenerating Stations · Four land parcels to the south and west of the East Claydon substation, Bucks. application due September 2025
22.7 km away - Pre-application
SDC M40 CampusGenerating Stations · The site of the project is located in Buckinghamshire, England. It is approximately 2km to the west of Gerrards Cross, approximately 2.5km east of Beaconsfield and approximately 1.5km north of Hedgerley. The site comprises land immediately to the south of the A40 Oxford Road and immediately to the north of the M40 motorway. It has a history of landfill activities and is currently operated by Veolia for the landfilling of inert building waste (albeit the site no longer accepts any forms of waste). application due January 2027
23.3 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.