Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
0hours of spills in 2025 between them (typical neighbourhood: about 36)
0spill events counted
Thames Water
Tring (2m - Main Outfall)into Into Guc/Reservoir0 spills, 0 hours in 2025
9 planned, approved or being built and 7 running (63 MW between them). Those within 5 km are on the map above.
Rooftop solar
Safren Power Uk Limited - Solar PhotovoltaicApproved, not yet built · 990 kW
Jul 2022 3.2 km away
Battery storage
Stablebridge Road, Aston Clinton - Battery StorageApproved, not yet built · 200 kW
Feb 2026 4.4 km away
Rooftop solar
Bellingdon Brickworks, Chesham Road - Solar PanelsApproved, not yet built · 330 kW
Jan 2026 5.8 km away
Rooftop solar
Ashlyns Nursing Home, Chesham Road - Solar PanelsApproved, not yet built · 160 kW
Sept 2025 7.7 km away
Solar farm
Hale Solar FarmPlanning application in · 40 MW
Mar 2020 8.6 km away
Solar farm
Straws Hadley Solar FarmApproved, not yet built · 50 MW
Dec 2024 8.8 km away
Solar farm
Bury Farm - Solar FarmApproved, not yet built · 50 MW
Jul 2022 9.0 km away
Solar farm
Ledburn, Mentmore - Solar FarmApproved, not yet built · 50 MW
Dec 2025 9.4 km away
Solar farm
Little Heath Lane - Solar PV ArrayPlanning application in · 25 MW
Apr 2022 9.8 km away
Running nearest: Long Meadow Farm (solar farm, 5.2 km); Great Seabrook Farm (solar farm, 5.7 km); Gib Lane (Aston Clinton solar park) (solar farm, 6.0 km); Arla Dairy Site (anaerobic digestion, 6.6 km); Gib Lane Solar farm (Extension) (solar farm, 6.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Road and street works within 1 km
13 permitted works running now or planned, 6 of them major.
Major, planned
London Road, TringHighway repair and maintenance works · HERTFORDSHIRE COUNTY COUNCIL · Road closure
Feb 2027 to Mar 2027 700 m away
Major, planned
Tring Road, DudswellHighway repair and maintenance works · HERTFORDSHIRE COUNTY COUNCIL · Road closure
Feb 2027 to Mar 2027 900 m away
Major, planned
A41 Interchange Tring, WiggintonHighway repair and maintenance works · HERTFORDSHIRE COUNTY COUNCIL · Road closure
Feb 2027 to Mar 2027 900 m away
Major, planned
Eastbound A41 Offslip To Tring Road A41 And A4251 Interchange, WiggintonHighway repair and maintenance works · HERTFORDSHIRE COUNTY COUNCIL · Road closure
Feb 2027 to Mar 2027 900 m away
Major, planned
A41 Interchange Tring, WiggintonHighway repair and maintenance works · HERTFORDSHIRE COUNTY COUNCIL · Road closure
Mar 2027 to Mar 2027 1000 m away
Major, planned
Westbound A41 Onslip From Tring Road A41 And A4251 Interchange, WiggintonHighway repair and maintenance works · HERTFORDSHIRE COUNTY COUNCIL · Road closure
Mar 2027 to Mar 2027 1000 m away
Standard
Mortimer Hill, TringNew service connection · UK POWER NETWORKS EASTERN & LONDON · Multi-way signals
Oct 2026 to Oct 2026 750 m away
Standard
Mill Gardens, TringRemedial works · HERTFORDSHIRE COUNTY COUNCIL · Give and take
Oct 2026 to Oct 2026 850 m away
Minor
Chiltern Way, TringUtility asset works · THAMES WATER · Some carriageway incursion
Rosefield Solar FarmGenerating Stations · Four land parcels to the south and west of the East Claydon substation, Bucks.
application due September 2025 23.1 km away
Pre-application
SDC M40 CampusGenerating Stations · The site of the project is located in Buckinghamshire, England. It is approximately 2km to the west of Gerrards Cross, approximately 2.5km east of Beaconsfield and approximately 1.5km north of Hedgerley. The site comprises land immediately to the south of the A40 Oxford Road and immediately to the north of the M40 motorway. It has a history of landfill activities and is currently operated by Veolia for the landfilling of inert building waste (albeit the site no longer accepts any forms of waste).
application due January 2027 23.8 km away
Decided
Millbrook PowerGenerating Stations · The Rookery Pit Near Stewartby, Bedfordshire
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Tring East, Wigginton & Aldbury: +17% over five years (2020 → 2025).
Council tax list: 10 homes added in the neighbourhood since April 2024.
Population (GP registrations): +0.2% in two years.
Hollyfield Close, TringUtility asset works · THAMES WATER · Give and take
Oct 2026 to Nov 2026 450 m away
Immediate - urgent
Tring Town Footpath 041, TringHighway repair and maintenance works · HERTFORDSHIRE COUNTY COUNCIL · No carriageway incursion
Sept 2026 to Oct 2026 800 m away
Minor
Rosebery Way, TringUtility asset works · THAMES WATER · Give and take
Oct 2026 to Nov 2026 800 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
decided Mar 2019 29.8 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.