Country England and Wales › Region South East › Council Buckinghamshire › Neighbourhood Wing, Wingrave & Bierton › Postcode HP22 5AX What's changing near HP22 5AX Within 2 km, around Wing, Wingrave & Bierton in Buckinghamshire. Building, planning, schools, transport, prices and crime.
269 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+1.8% like-for-like prices in Wing, Wingrave & Bierton, 2024 → 2025 (council +2.0%)
+1% recorded crime, last 12 months vs the 12 before
On the map
New homes Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 17 new homes completed houses · Apr 2025 – Aug 2026
Aug 2026 1.4 km away New homes 23 new homes completed houses · May 2025 – Jul 2026
Jul 2026 1.2 km away New homes 9 new homes completed houses · Dec 2025 – Jun 2026
Jun 2026 1.3 km away New homes 24 new homes completed houses · Aug 2025 – May 2026
May 2026 1.4 km away New homes 17 new homes completed houses · Dec 2025 – May 2026
May 2026 1.3 km away New homes 5 new homes completed houses · Mar 2025 – May 2026
May 2026 1000 m away New homes 27 new homes completed houses · Jul 2025 – Apr 2026
Apr 2026 1.3 km away New homes 8 new homes completed houses · Jul 2025 – Feb 2026
Feb 2026 1.4 km away New homes 14 new homes completed houses · Mar 2025 – Nov 2025
Nov 2025 1.4 km away New homes 10 new homes completed 9 flats, 1 houses · Feb 2025 – Nov 2025
Nov 2025 1.5 km away New homes 6 new homes completed houses · Dec 2024 – Nov 2025
Nov 2025 1.4 km away New homes 26 new homes completed houses · Nov 2024 – Sep 2025
Sept 2025 1.5 km away 1 homes extended 2021–2025, typically adding 140 m²
1 since energy certificates began (2008)
1 in HP22 5AX itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 1 storm overflows within 2 km
23 hours of spills in 2025 between them (typical neighbourhood: about 36)
8 spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 14 planned, approved or being built and 8 running (64 MW between them). Those within 5 km are on the map above.
Solar farm Hale Solar Farm Planning application in · 40 MW
Mar 2020 750 m away Solar farm Straws Hadley Solar Farm Approved, not yet built · 50 MW
Dec 2024 2.6 km away Rooftop solar The Whiteleaf Centre, Bierton Road - Solar Panels Approved, not yet built · 420 kW
Oct 2023 3.6 km away Rooftop solar Aqua Vale Swimming and Fitness Centre, Park Street - Solar Panels Approved, not yet built · 290 kW
Jan 2025 3.8 km away Rooftop solar Gatehouse Road - Solar Panels Approved, not yet built · 520 kW
Sept 2023 4.8 km away Rooftop solar Aylesbury College Decarbonisation - Solar Panels Approved, not yet built · 540 kW
Sept 2025 5.1 km away Battery storage Stablebridge Road, Aston Clinton - Battery Storage Approved, not yet built · 200 kW
Feb 2026 6.1 km away Rooftop solar Faccenda Foods, Wellington Farm - Solar Array Planning application in · 150 kW
Jan 2025 7.1 km away Solar farm Ledburn, Mentmore - Solar Farm Approved, not yet built · 50 MW
Dec 2025 7.4 km away Solar farm Moat Farm - Solar Farm Approved, not yet built · 24 MW
Feb 2022 7.5 km away Rooftop solar
Road and street works within 1 km 1 permitted works running now or planned, 1 of them major.
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Recommendation Rosefield Solar Farm Generating Stations · Four land parcels to the south and west of the East Claydon substation, Bucks. application due September 2025 13.8 km away Decided decided Sept 2014 19.8 km away Decided decided Oct 2013 24.1 km away Decided decided Apr 2025 27.1 km away Decided Millbrook Power Generating Stations · The Rookery Pit Near Stewartby, Bedfordshire decided Mar 2019 29.0 km away Decided decided Oct 2011 29.5 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Folly Farm (solar farm, 1.7 km); Gib Lane Solar farm (Extension) (solar farm, 2.5 km); Arla Dairy Site (anaerobic digestion, 3.0 km); Gib Lane (Aston Clinton solar park) (solar farm, 4.1 km); Quarrendon Fields (wind farm, 4.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.