Country England and Wales › Region South East › Council Buckinghamshire › Neighbourhood Victoria Park › Postcode HP20 1NX What's changing near HP20 1NX Within 2 km, around Victoria Park in Buckinghamshire. Building, planning, schools, transport, prices and crime.
599 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+3.5% like-for-like prices in Victoria Park, 2024 → 2025 (council +2.0%)
+23% recorded crime, last 12 months vs the 12 before
On the map
New homes School opened Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 14 new homes completed houses · Jan 2026 – Oct 2026
planned Oct 2026 1.3 km away New homes 25 new homes completed houses · Mar 2026 – Oct 2026
planned Oct 2026 1.3 km away New homes 11 new homes completed houses · Sep 2026 – Oct 2026
planned Oct 2026 1.3 km away New homes 7 new homes completed houses · Jul 2026 – Sep 2026
Sept 2026 1.4 km away New homes 14 new homes completed houses · Jul 2026 – Sep 2026
Sept 2026 1.4 km away New homes 18 new homes completed houses · Mar 2026 – Sep 2026
Sept 2026 1.9 km away New homes 17 new homes completed houses · Apr 2025 – Aug 2026
Aug 2026 1.6 km away New school New school: Red Balloon Aylesbury Other independent special school, other independent special school
Aug 2026 1.7 km away New homes 23 new homes completed houses · May 2025 – Jul 2026
Jul 2026 1.8 km away New homes 14 new homes completed houses · May 2026 – Jun 2026
Jun 2026 1.2 km away New homes 9 new homes completed houses · Dec 2025 – Jun 2026
Jun 2026 1.8 km away New homes 24 new homes completed houses · Aug 2025 – May 2026
13 homes extended 2021–2025, typically adding 31 m²
20 since energy certificates began (2008)
1 in HP20 1NX itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 12 planned, approved or being built and 7 running (58 MW between them). Those within 5 km are on the map above.
Rooftop solar Aqua Vale Swimming and Fitness Centre, Park Street - Solar Panels Approved, not yet built · 290 kW
Jan 2025 1.3 km away Rooftop solar The Whiteleaf Centre, Bierton Road - Solar Panels Approved, not yet built · 420 kW
Oct 2023 1.4 km away Rooftop solar Aylesbury College Decarbonisation - Solar Panels Approved, not yet built · 540 kW
Sept 2025 2.7 km away Rooftop solar Gatehouse Road - Solar Panels Approved, not yet built · 520 kW
Sept 2023 2.8 km away Solar farm Hale Solar Farm Planning application in · 40 MW
Mar 2020 3.3 km away Solar farm Moat Farm - Solar Farm Approved, not yet built · 24 MW
Feb 2022 4.4 km away Battery storage Stablebridge Road, Aston Clinton - Battery Storage Approved, not yet built · 200 kW
Feb 2026 5.4 km away Solar farm Straws Hadley Solar Farm Approved, not yet built · 50 MW
Dec 2024 5.6 km away Solar farm Kimblewick Road Solar Farm Approved, not yet built · 40 MW
Jan 2026 7.2 km away Solar farm Callie's Solar Farm Approved, not yet built · 50 MW
Nov 2022 8.9 km away Rooftop solar Pitchcott Hill Farm, Pitchcott Hill - Solar Panels
Road and street works within 1 km 8 permitted works running now or planned, 4 of them major.
Major, planned Broughton Avenue, Aylesbury Utility repair and maintenance works · THAMES WATER · Road closure
Feb 2027 to Feb 2027 300 m away Major Tring Road, Aylesbury Highway improvement works · Buckinghamshire Council · Road closure
Oct 2026 to Nov 2026 600 m away Major, planned Albert Street, Aylesbury Utility asset works · BT · Road closure
Nov 2026 to Nov 2026 900 m away Major Albert Street, Aylesbury Utility asset works · BT · Road closure
Nov 2026 to Nov 2026 900 m away Standard Penrith Way, Aylesbury Highway repair and maintenance works · UK POWER NETWORKS EASTERN & LONDON · Some carriageway incursion
Oct 2026 to Oct 2026 750 m away Minor Heron Close, Aylesbury Utility asset works · THAMES WATER · Some carriageway incursion
Oct 2026 to Oct 2026 550 m away Minor Walton Way, Aylesbury Utility repair and maintenance works · THAMES WATER · Some carriageway incursion
Nov 2026 to Nov 2026 750 m away Minor Long Meadow, Aylesbury Utility repair and maintenance works · THAMES WATER · No carriageway incursion
Oct 2026 to Oct 2026 1000 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Recommendation Rosefield Solar Farm Generating Stations · Four land parcels to the south and west of the East Claydon substation, Bucks. application due September 2025 14.4 km away Decided decided Sept 2014 22.2 km away Decided decided Oct 2013 25.8 km away Pre-application SDC M40 Campus Generating Stations · The site of the project is located in Buckinghamshire, England. It is approximately 2km to the west of Gerrards Cross, approximately 2.5km east of Beaconsfield and approximately 1.5km north of Hedgerley. The site comprises land immediately to the south of the A40 Oxford Road and immediately to the north of the M40 motorway. It has a history of landfill activities and is currently operated by Veolia for the landfilling of inert building waste (albeit the site no longer accepts any forms of waste). application due January 2027 28.7 km away Decided decided Apr 2025 28.9 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Arla Dairy Site (anaerobic digestion, 3.1 km); Gib Lane Solar farm (Extension) (solar farm, 3.4 km); Gib Lane (Aston Clinton solar park) (solar farm, 3.5 km); Folly Farm (solar farm, 3.9 km); Quarrendon Fields (wind farm, 4.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.