Country England and Wales › Region South East › Council Buckinghamshire › Neighbourhood Victoria Park › Postcode HP20 1HP What's changing near HP20 1HP Within 2 km, around Victoria Park in Buckinghamshire. Building, planning, schools, transport, prices and crime.
262 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+3.5% like-for-like prices in Victoria Park, 2024 → 2025 (council +2.0%)
+23% recorded crime, last 12 months vs the 12 before
On the map
New homes School opened Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 17 new homes completed houses · Apr 2025 – Aug 2026
Aug 2026 1.9 km away New school New school: Red Balloon Aylesbury Other independent special school, other independent special school
Aug 2026 1.4 km away New homes 21 new homes completed houses · Dec 2024 – Feb 2026
Feb 2026 2.0 km away New homes 8 new homes completed houses · Jul 2025 – Feb 2026
Feb 2026 1.9 km away New homes 38 new homes completed houses · Nov 2024 – Jan 2026
Jan 2026 1.8 km away New homes 12 new homes completed houses · Sep 2025 – Nov 2025
Nov 2025 1.8 km away New homes 27 new homes completed flats · Nov 2025
Nov 2025 1.1 km away New homes 14 new homes completed houses · Mar 2025 – Nov 2025
Nov 2025 1.8 km away New homes 10 new homes completed 9 flats, 1 houses · Feb 2025 – Nov 2025
Nov 2025 1.9 km away New homes 7 new homes completed houses · Jul 2025
Jul 2025 1.7 km away New homes 36 new homes completed houses · Jan 2025 – Jul 2025
Jul 2025 1.7 km away New homes 9 new homes completed houses · Feb 2025 – Jun 2025
Jun 2025 1.9 km away 7 homes extended 2021–2025, typically adding 21 m²
13 since energy certificates began (2008)
1 in HP20 1HP itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 14 planned, approved or being built and 5 running (49 MW between them). Those within 5 km are on the map above.
Rooftop solar The Whiteleaf Centre, Bierton Road - Solar Panels Approved, not yet built · 420 kW
Oct 2023 400 m away Rooftop solar Aqua Vale Swimming and Fitness Centre, Park Street - Solar Panels Approved, not yet built · 290 kW
Jan 2025 700 m away Rooftop solar Gatehouse Road - Solar Panels Approved, not yet built · 520 kW
Sept 2023 1.8 km away Rooftop solar Aylesbury College Decarbonisation - Solar Panels Approved, not yet built · 540 kW
Sept 2025 2.0 km away Solar farm Hale Solar Farm Planning application in · 40 MW
Mar 2020 3.6 km away Solar farm Moat Farm - Solar Farm Approved, not yet built · 24 MW
Feb 2022 4.6 km away Solar farm Straws Hadley Solar Farm Approved, not yet built · 50 MW
Dec 2024 5.8 km away Battery storage Stablebridge Road, Aston Clinton - Battery Storage Approved, not yet built · 200 kW
Feb 2026 6.5 km away Solar farm Kimblewick Road Solar Farm Approved, not yet built · 40 MW
Jan 2026 7.2 km away Rooftop solar Pitchcott Hill Farm, Pitchcott Hill - Solar Panels Approved, not yet built · 170 kW
Mar 2025 8.0 km away Solar farm
Road and street works within 1 km 12 permitted works running now or planned, 7 of them major.
Major, planned Fairfax Crescent, Aylesbury New service connection · THAMES WATER · Road closure
Oct 2026 to Oct 2026 600 m away Major Fairfax Crescent, Aylesbury New service connection · THAMES WATER · Road closure
Oct 2026 to Oct 2026 600 m away Major, planned Albert Street, Aylesbury Utility asset works · BT · Road closure
Nov 2026 to Nov 2026 750 m away Major Albert Street, Aylesbury Utility asset works · BT · Road closure
Nov 2026 to Nov 2026 750 m away Major Vale Park Drive, Aylesbury Highway repair and maintenance works · Buckinghamshire Council · Road closure
Dec 2026 to Dec 2026 750 m away Major Elmhurst Road, Aylesbury Highway repair and maintenance works · Buckinghamshire Council · Road closure
Dec 2026 to Dec 2026 800 m away Major, planned Bardon Green, Aylesbury Highway improvement works · Buckinghamshire Council · Road closure
Feb 2027 to Mar 2027 850 m away Standard Tring Road, Aylesbury Utility repair and maintenance works · UK POWER NETWORKS EASTERN & LONDON · Multi-way signals
Nov 2026 to Nov 2026 850 m away Minor Bierton Road, Aylesbury Utility asset works · BT · Some carriageway incursion
Oct 2026 to Oct 2026 300 m away Minor Manor Drive, Aylesbury
Major infrastructure projects within 30 km Recommendation Rosefield Solar Farm Generating Stations · Four land parcels to the south and west of the East Claydon substation, Bucks. application due September 2025 13.3 km away Decided decided Sept 2014 22.8 km away Decided decided Oct 2013 26.6 km away Pre-application SDC M40 Campus Generating Stations · The site of the project is located in Buckinghamshire, England. It is approximately 2km to the west of Gerrards Cross, approximately 2.5km east of Beaconsfield and approximately 1.5km north of Hedgerley. The site comprises land immediately to the south of the A40 Oxford Road and immediately to the north of the M40 motorway. It has a history of landfill activities and is currently operated by Veolia for the landfilling of inert building waste (albeit the site no longer accepts any forms of waste). application due January 2027 29.7 km away Decided decided Apr 2025 29.8 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Quarrendon Fields (wind farm, 3.4 km); Arla Dairy Site (anaerobic digestion, 4.1 km); Gib Lane Solar farm (Extension) (solar farm, 4.3 km); Folly Farm (solar farm, 4.4 km); Gib Lane (Aston Clinton solar park) (solar farm, 4.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.