What's changing near HP15 7LA
Within 2 km, around Hazlemere in Buckinghamshire. Building, planning, schools, transport, prices and crime.
63new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+6.4%like-for-like prices in Hazlemere, 2024 → 2025 (council +2.0%)
+11%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool openedExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New school
New school: Ash Hill Primary SchoolAcademy sponsor led, primary
planned Nov 2026
1.9 km away - New homes
27 new homes completed7 flats, 20 houses · May 2026 – Oct 2026
planned Oct 2026
1.0 km away - New homes
21 new homes completed4 flats, 17 houses · Dec 2025 – Jun 2026
Jun 2026
1.0 km away - New schoolMay 2022
500 m away
New-home postcodes with fewer than 5 homes are counted above but not listed. 12 postcodes nearby had new homes completed in the last two years.
20homes extended 2021–2025, typically adding 48 m²
31since energy certificates began (2008)
3in HP15 7LA itself
- Extendedcertificate 2025
- Extendedcertificate 2025
- Extendedcertificate 2024
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
15 planned, approved or being built and 5 running (51 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Holmer Green Senior School - Solar PanelsApproved, not yet built · 180 kW
Sept 2024
2.1 km away - Battery storage
Mop End Farm, Mop End Lane - Battery Energy StoragePlanning application in · 500 MW
Aug 2025
3.1 km away - Rooftop solar
Big Yellow Self Storage, London Road - Solar PanelsApproved, not yet built · 180 kW
Sept 2024
3.4 km away - Battery storage
Derehams Farm, Derehams Lane - Battery StoragePlanning application in · 126 MW
Nov 2023
4.1 km away - Rooftop solar
Newlands Meadow, Eden - Solar PanelsApproved, not yet built · 150 kW
Aug 2022
4.1 km away - Rooftop solar
Eden Shopping Centre, Oxford Road - Solar PanelsApproved, not yet built · 630 kW
Sept 2023
4.1 km away - Rooftop solar
Wycombe Leisure Centre, Handy Cross - Solar PanelsApproved, not yet built · 500 kW
Dec 2024
5.6 km away - Rooftop solar
David Lloyd Leisure Group - Solar PV SystemApproved, not yet built
Aug 2023
5.9 km away - Solar farm
Salters Lane - Solar PanelsPlanning application in
Jul 2025
7.0 km away - Battery storage
Salters Lane - Solar PanelsPlanning application in
Jul 2025
7.0 km away - Solar farm
Road and street works within 1 km
2 permitted works running now or planned, 1 of them major.
- Major, planned
Hazlemere Road, PennHighway improvement works · Buckinghamshire Council · Road closure
Jul 2027 to Aug 2027
800 m away - Minor
Hill Farm Way, HazlemereUtility asset works · THAMES WATER · No carriageway incursion
Feb 2027 to Feb 2027
650 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-application
SDC M40 CampusGenerating Stations · The site of the project is located in Buckinghamshire, England. It is approximately 2km to the west of Gerrards Cross, approximately 2.5km east of Beaconsfield and approximately 1.5km north of Hedgerley. The site comprises land immediately to the south of the A40 Oxford Road and immediately to the north of the M40 motorway. It has a history of landfill activities and is currently operated by Veolia for the landfilling of inert building waste (albeit the site no longer accepts any forms of waste). application due January 2027
10.0 km away - Decideddecided Nov 2023
14.8 km away - Decideddecided Sept 2016
18.2 km away - Pre-application
Heathrow WestAirports · Heathrow Airport and land to the north-west and west of Heathrow Airport application due November 2027
23.8 km away - Pre-applicationapplication due December 2027
26.0 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Derehams Farm, Derehams Lane - Battery Storage (battery storage, 4.1 km); High Heavens Landfill (landfill gas, 8.5 km); Wapsey's Wood (landfill gas, 9.7 km); Wapsey's Wood II Landfill Site (landfill gas, 9.7 km); Wapsey's Wood III (landfill gas, 9.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.