What's changing near HP13 7NW
Within 2 km, around Totteridge in Buckinghamshire. Building, planning, schools, transport, prices and crime.
228new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
-0.9%like-for-like prices in Totteridge, 2024 → 2025 (council +2.0%)
-12%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New school
New school: Ash Hill Primary SchoolAcademy sponsor led, primary
planned Nov 2026
1.1 km away - New homes
8 new homes completedflats · Sep 2026
Oct 2026
750 m away - New homes
8 new homes completedflats · Sep 2026
Sept 2026
1.4 km away - New homes
23 new homes completedflats · May 2026 – Jul 2026
Jul 2026
1.0 km away - New homes
52 new homes completed40 flats, 12 houses · Apr 2025 – Mar 2026
Mar 2026
1.6 km away - New homes
22 new homes completed1 flats, 21 houses · Oct 2024 – Mar 2026
Mar 2026
1.4 km away - New homes
15 new homes completedhouses · Jan 2026 – Feb 2026
Feb 2026
1.5 km away - New homes
6 new homes completedhouses · Oct 2024 – Jan 2026
Jan 2026
1.4 km away - New homes
23 new homes completed1 flats, 22 houses · Jan 2025 – Sep 2025
Sept 2025
1.5 km away - New homes
9 new homes completedflats · May 2025
May 2025
700 m away - New homes
24 new homes completedflats · May 2025
May 2025
800 m away - New homes
18 new homes completedflats · Apr 2025
Apr 20251.2 km away
23homes extended 2021–2025, typically adding 32 m²
46since energy certificates began (2008)
1in HP13 7NW itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
98hours of spills in 2025 between them (typical neighbourhood: about 36)
5spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
15 planned, approved or being built and 5 running (51 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Big Yellow Self Storage, London Road - Solar PanelsApproved, not yet built · 180 kW
Sept 2024
450 m away - Rooftop solar
Newlands Meadow, Eden - Solar PanelsApproved, not yet built · 150 kW
Aug 2022
2.2 km away - Rooftop solar
Eden Shopping Centre, Oxford Road - Solar PanelsApproved, not yet built · 630 kW
Sept 2023
2.2 km away - Battery storage
Derehams Farm, Derehams Lane - Battery StoragePlanning application in · 126 MW
Nov 2023
2.5 km away - Rooftop solar
Wycombe Leisure Centre, Handy Cross - Solar PanelsApproved, not yet built · 500 kW
Dec 2024
3.0 km away - Rooftop solar
David Lloyd Leisure Group - Solar PV SystemApproved, not yet built
Aug 2023
4.2 km away - Rooftop solar
Holmer Green Senior School - Solar PanelsApproved, not yet built · 180 kW
Sept 2024
4.9 km away - Rooftop solar
Thomas Road, Wooburn Industrial Estate - Solar PanelsApproved, not yet built · 420 kW
Nov 2023
5.2 km away - Solar farm
Salters Lane - Solar PanelsPlanning application in
Jul 2025
5.8 km away - Battery storage
Salters Lane - Solar PanelsPlanning application in
Jul 2025
5.8 km away - Solar farm
Road and street works within 1 km
7 permitted works running now or planned, 2 of them major.
- Major, planned
Melbourne Road, High WycombeUtility asset works · BT · Road closure
Dec 2026 to Dec 2026
600 m away - Major
Melbourne Road, High WycombeUtility asset works · BT · Road closure
Dec 2026 to Dec 2026
600 m away - Minor
Windrush Drive, High WycombeUtility asset works · THAMES WATER · Some carriageway incursion
Oct 2026 to Oct 2026
200 m away - Minor
Horsenden Road, High WycombeUtility asset works · THAMES WATER · Give and take
Oct 2026 to Nov 2026
250 m away - Minor
Spring Gardens Road, High WycombeUtility asset works · THAMES WATER · No carriageway incursion
Dec 2026 to Dec 2026
450 m away - Minor
Hicks Farm Rise, High WycombeUtility asset works · THAMES WATER · Some carriageway incursion
Oct 2026 to Oct 2026
600 m away - Minor
Hicks Farm Rise, High WycombeUtility asset works · THAMES WATER · Give and take
Oct 2026 to Nov 2026
650 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-application
SDC M40 CampusGenerating Stations · The site of the project is located in Buckinghamshire, England. It is approximately 2km to the west of Gerrards Cross, approximately 2.5km east of Beaconsfield and approximately 1.5km north of Hedgerley. The site comprises land immediately to the south of the A40 Oxford Road and immediately to the north of the M40 motorway. It has a history of landfill activities and is currently operated by Veolia for the landfilling of inert building waste (albeit the site no longer accepts any forms of waste). application due January 2027
9.8 km away - Decideddecided Nov 2023
13.0 km away - Decideddecided Sept 2016
15.4 km away - Pre-application
Heathrow WestAirports · Heathrow Airport and land to the north-west and west of Heathrow Airport application due November 2027
23.0 km away - Pre-applicationapplication due December 2027
25.2 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Derehams Farm, Derehams Lane - Battery Storage (battery storage, 2.5 km); High Heavens Landfill (landfill gas, 5.9 km); Wapsey's Wood (landfill gas, 9.5 km); Wapsey's Wood II Landfill Site (landfill gas, 9.6 km); Wapsey's Wood III (landfill gas, 9.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.