Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
14 planned, approved or being built and 2 running (42 MW between them). Those within 5 km are on the map above.
Rooftop solar
Wycombe Leisure Centre, Handy Cross - Solar PanelsApproved, not yet built · 500 kW
Dec 2024 1.7 km away
Rooftop solar
Newlands Meadow, Eden - Solar PanelsApproved, not yet built · 150 kW
Aug 2022 2.0 km away
Rooftop solar
Eden Shopping Centre, Oxford Road - Solar PanelsApproved, not yet built · 630 kW
Sept 2023 2.0 km away
Rooftop solar
Big Yellow Self Storage, London Road - Solar PanelsApproved, not yet built · 180 kW
Sept 2024 3.7 km away
Rooftop solar
Globe Business Park, Fieldhouse Lane - PV PanelsApproved, not yet built
Jan 2023 5.9 km away
Battery storage
Derehams Farm, Derehams Lane - Battery StoragePlanning application in · 126 MW
Nov 2023 6.2 km away
Rooftop solar
David Lloyd Leisure Group - Solar PV SystemApproved, not yet built
Aug 2023 7.4 km away
Rooftop solar
Holmer Green Senior School - Solar PanelsApproved, not yet built · 180 kW
Sept 2024 7.5 km away
Rooftop solar
Thomas Road, Wooburn Industrial Estate - Solar PanelsApproved, not yet built · 420 kW
Nov 2023 7.7 km away
Solar farm
Salters Lane - Solar PanelsPlanning application in
Jul 2025 9.2 km away
Road and street works within 1 km
11 permitted works running now or planned, 1 of them major.
Major
Fernie Fields, High WycombeUtility asset works · CADENT GAS LIMITED · Some carriageway incursion
Jan 2027 to Feb 2027 650 m away
Standard
New Road, High WycombeNew service connection · THAMES WATER · Multi-way signals
Oct 2026 to Oct 2026 850 m away
Minor
Laburnum Road, High WycombeHighway repair and maintenance works · Buckinghamshire Council · Stop/go boards
Dec 2026 to Dec 2026 100 m away
Minor
Chiltern Avenue, High WycombeUtility asset works · THAMES WATER · No carriageway incursion
Dec 2026 to Dec 2026 550 m away
Minor
Carrington Road, High WycombeUtility asset works · THAMES WATER · Give and take
Oct 2026 to Nov 2026 600 m away
Minor
Arundel Road, High WycombeUtility asset works · THAMES WATER · Give and take
Oct 2026 to Nov 2026 750 m away
Minor
Barbers Wood Road, High WycombeHighway repair and maintenance works · Buckinghamshire Council · Stop/go boards
Dec 2026 to Dec 2026 750 m away
Minor
Spearing Road, High WycombeUtility asset works · THAMES WATER · No carriageway incursion
Nov 2026 to Nov 2026 750 m away
Minor
Deeds Grove, High WycombeUtility asset works · THAMES WATER · Give and take
Oct 2026 to Nov 2026 900 m away
Minor
Deeds Grove, High Wycombe
Major infrastructure projects within 30 km
Pre-application
SDC M40 CampusGenerating Stations · The site of the project is located in Buckinghamshire, England. It is approximately 2km to the west of Gerrards Cross, approximately 2.5km east of Beaconsfield and approximately 1.5km north of Hedgerley. The site comprises land immediately to the south of the A40 Oxford Road and immediately to the north of the M40 motorway. It has a history of landfill activities and is currently operated by Veolia for the landfilling of inert building waste (albeit the site no longer accepts any forms of waste).
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Oakridge & Castlefield: +12% over five years (2020 → 2025).
Council tax list: 20 homes added in the neighbourhood since April 2024.
Population (GP registrations): -3.0% in two years.